Short-term regulating capacity and operational patterns of The Lule River with large wind power penetration
Uppsala universitet, Teknisk-naturvetenskapliga vetenskapsområdet, Tekniska sektionen, Institutionen för teknikvetenskaper, Elektricitetslära.
2014 (engelsk)Independent thesis Advanced level (professional degree), 20 poäng / 30 hpOppgave
Abstract [en]

The growing share of installed wind power in the Swedish electricity system has

caused concerns whether the available regulating power will be sufficient. Several

studies have examined the need of regulating power using both statistical and

modelling approaches. However, there is a risk that some aspects of the short-term

regulation of hydropower might have been missed.

By using one of Vattenfall’s hydropower planning tools, the short-term operation of

The Lule River has been simulated with an increasing penetration of wind power. The

tool includes detailed models of reservoirs, generating units including efficiency curves

and start/stop costs. By introducing a day-by-day simulation with a seven-day window

price forecast, updated with a new wind forecast for each iteration, a 21-days

scenario has been simulated. Transmission limits are disregarded and the thermal

production is reduced with the average wind production.

To quantify and compare the regulation capacity, the regulation factor is introduced.

It reflects the ability to utilise high-price hours and considering that the need of

regulating power for the short-term perspective is reflected in the price it will also

reflect the regulation capacity.

It is shown that the regulating factor is correlated to the discharge factor,whichis the

relation between the maximum discharge to the average statistical discharge for a

plant. A high discharge factor provides the flexibility to utilise the fluctuations in price.

The discharge factor is adapted to the plants placement in the reach, accounting for

both reservoirs located upstream and downstream, especially for The Lule River

which has been designed to regulate for the fluctuations in the load. The flexibility

required by the rest of the Nordic rivers is quantified for future studies.

It is concluded that The Lule River is able to meet some of the fluctuations of wind

power production due to the overcapacity ininstalled power. The production can, at

the expense of decreased efficiency of the generating units, alter the production to

suit a more fluctuating price.It is important to emphasise that The Lule River alone

cannot balance a large penetration of wind power.

To fully take into account the effects of a large penetration of wind power the study

must be expanded to include more scenarios. The study should include different types

of hydrological prerequisites and the seasonal variations in power production as well

as additional rivers.

sted, utgiver, år, opplag, sider
2014. , s. 46
Serie
UPTEC F, ISSN 1401-5757 ; 14026
Emneord [en]
Flexible generation, forecast error, HOTSHOT, hydropower planning, intermittent renewable energy sources, profit optimisation, regulation factor, short-term regulation, short-term production planning, The Lule River
Emneord [sv]
Flexibel kraft, förnyelsebara intermittenta energikällor, HOTSHOT, korttids reglering, korttids produktionsplanering, Lule älv, prognosfel, reglerfaktor, vattenkraftsplanering, vinstmaximering
HSV kategori
Identifikatorer
URN: urn:nbn:se:uu:diva-230972OAI: oai:DiVA.org:uu-230972DiVA, id: diva2:742524
Eksternt samarbeid
Vattenfall
Utdanningsprogram
Master Programme in Engineering Physics
Veileder
Examiner
Tilgjengelig fra: 2014-09-11 Laget: 2014-09-01 Sist oppdatert: 2014-09-11bibliografisk kontrollert

Open Access i DiVA

fulltext(1751 kB)576 nedlastinger
Filinformasjon
Fil FULLTEXT01.pdfFilstørrelse 1751 kBChecksum SHA-512
b4e2c1c56aa6beb59eea8e34871537fe960f5402e9a5345ee9658c55fdc3bc36264b20516002dd723653e29f9a2bb142387415e32eb0902828b48c07706cc73d
Type fulltextMimetype application/pdf

Av organisasjonen

Søk utenfor DiVA

GoogleGoogle Scholar
Totalt: 576 nedlastinger
Antall nedlastinger er summen av alle nedlastinger av alle fulltekster. Det kan for eksempel være tidligere versjoner som er ikke lenger tilgjengelige

urn-nbn

Altmetric

urn-nbn
Totalt: 1627 treff
RefereraExporteraLink to record
Permanent link

Direct link
Referera
Referensformat
  • apa
  • ieee
  • modern-language-association
  • vancouver
  • Annet format
Fler format
Språk
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Annet språk
Fler språk
Utmatningsformat
  • html
  • text
  • asciidoc
  • rtf