uu.seUppsala universitets publikasjoner
Endre søk
RefereraExporteraLink to record
Permanent link

Direct link
Referera
Referensformat
  • apa
  • ieee
  • modern-language-association
  • vancouver
  • Annet format
Fler format
Språk
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Annet språk
Fler språk
Utmatningsformat
  • html
  • text
  • asciidoc
  • rtf
Tidsslöseri i byggbranschen: Synliggörande av problem med tidsslöeri i byggproduktion
Uppsala universitet, Teknisk-naturvetenskapliga vetenskapsområdet, Tekniska sektionen, Institutionen för teknikvetenskaper, Tillämpad mekanik, Byggteknik.
2015 (svensk)Independent thesis Basic level (professional degree), 10 poäng / 15 hpOppgave
Abstract [en]

The purpose of this thesis is to give a clear indication of how widely spread the

problem with time waste is in the construction industry. One of the big issues of

today is the large increase in construction cost of residential buildings. The cost of

producing new apartment buildings has increased with 140 percent in less than 20

years. Furthermore the study show that only 17.5 percent of a construction workers

day is value increasing work. The same study also show that 37.5 percent of a work

day is waste that can be completely eliminated and has no value to the customer. A

good way to approach this time waste problem could be to implement LEAN in to

the construction industry. This report is done together with Skanska Sweden AB in

Uppsala. The main research methods used in this report is a literature study,

interviews, an inquiry and visits to the construction sites. The result presented in this

report shows that there is a problem with time waste in Skanska projects in a couple

of different areas. The conclusions to this report show that the knowledge about

LEAN today is poor, negative attitude towards changes, these arguments are

hindering work to improve Production efficiency in the construction companies.

LEAN education for employees and dividing responsibility to all the workers on site

could be solutions that could change the industry to a more cost efficient

construction process.

sted, utgiver, år, opplag, sider
2015. , s. 87
HSV kategori
Identifikatorer
URN: urn:nbn:se:uu:diva-267364ISRN: UTH-INGUTB-EX-B-2015/16-SEOAI: oai:DiVA.org:uu-267364DiVA, id: diva2:872869
Eksternt samarbeid
Skanska
Utdanningsprogram
Bachelor Programme in Construction Engineering
Veileder
Examiner
Tilgjengelig fra: 2015-11-23 Laget: 2015-11-20 Sist oppdatert: 2015-11-23bibliografisk kontrollert

Open Access i DiVA

fulltext(21828 kB)392 nedlastinger
Filinformasjon
Fil FULLTEXT01.pdfFilstørrelse 21828 kBChecksum SHA-512
9887720d71731c638dff3f3eb985673ab99ed95dfd5869594bf6a03456ee9b56c1a4e794b9c78843a88c912814f1ff36d3a44fab50dc1167a3ec6edbf5968fe4
Type fulltextMimetype application/pdf

Av organisasjonen

Søk utenfor DiVA

GoogleGoogle Scholar
Totalt: 392 nedlastinger
Antall nedlastinger er summen av alle nedlastinger av alle fulltekster. Det kan for eksempel være tidligere versjoner som er ikke lenger tilgjengelige

urn-nbn

Altmetric

urn-nbn
Totalt: 1342 treff
RefereraExporteraLink to record
Permanent link

Direct link
Referera
Referensformat
  • apa
  • ieee
  • modern-language-association
  • vancouver
  • Annet format
Fler format
Språk
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Annet språk
Fler språk
Utmatningsformat
  • html
  • text
  • asciidoc
  • rtf