Description of a torus shaped buoy for wave energy point absorber
Uppsala University, Disciplinary Domain of Science and Technology, Technology, Department of Engineering Sciences, Electricity.
Uppsala University, Disciplinary Domain of Science and Technology, Technology, Department of Engineering Sciences, Electricity.
Uppsala University, Disciplinary Domain of Science and Technology, Technology, Department of Engineering Sciences, Electricity.
Uppsala University, Disciplinary Domain of Science and Technology, Technology, Department of Engineering Sciences, Electricity.
Show others and affiliations
2010 (English)Conference paper, Published paper (Refereed)
Place, publisher, year, edition, pages
2010.
National Category
Engineering and Technology
Identifiers
URN: urn:nbn:se:uu:diva-142504OAI: oai:DiVA.org:uu-142504DiVA: diva2:387539
Conference
Renewable Energy 2010, 27 June - 2 July, Pacifico Yokohama, Japan
Available from: 2011-01-14 Created: 2011-01-14 Last updated: 2015-01-07Bibliographically approved
In thesis
1. Experimental Measurement of Lateral Force in a Submerged Single Heaving Buoy Wave Energy Converter
Open this publication in new window or tab >>Experimental Measurement of Lateral Force in a Submerged Single Heaving Buoy Wave Energy Converter
2012 (English)Doctoral thesis, comprehensive summary (Other academic)
Abstract [en]

The search for new solutions for the generation of energy is becoming more and more important for our future. Big arguments and disagreements on e.g. the questions of gas transport or the dependence on energy supplied by other countries raise demands on the development of new forms of alternative energy resources. Wave power is one of the main sources of renewable energy due to the high power density stored in ocean waves.

Nevertheless, the dynamic forces of waves are so large that serious questions popped up on how to design a system which could work even in an unfavourable wave climate or could at least retain working capabilities after big storms without significant damages.

This thesis studies the reliability of the mechanical parts of a linear direct driven permanent magnet generator. The results of offshore experiment where strain gauge sensors instrumented on the capsule and the inner framework structure are presented. Stress estimation analyses using strain gauges are carried out. A method for measuring forces and moments in the mechanical structure of the WEC is developed.

Evaluation of the lateral force acting on the outer structure is a key factor for the design and construction of the WEC. A method for the measurement of the lateral force acting on the capsule has been developed.

A study of the inclination angle between the Wave Energy Converter and the floating buoy has been carried out.

The aim of this work is to contribute to the development of wave energy conversion system, and especially to the estimation of structural loads which are important for the survivability of the system under hard sea states.

This work is a step that may influence future design of wave energy devices in terms of material aspect, survivability in a hard wave climate and cost-effective renewable energies.

Place, publisher, year, edition, pages
Uppsala: Acta Universitatis Upsaliensis, 2012. 99 p.
Series
Digital Comprehensive Summaries of Uppsala Dissertations from the Faculty of Science and Technology, ISSN 1651-6214 ; 886
Keyword
Wave energy converter, Tight mooring system, Offshore measurement, Strain gauge, Estimation of stress, Lateral force, Inclination angle, Snatch load
National Category
Energy Engineering
Research subject
Engineering Science with specialization in Science of Electricity
Identifiers
urn:nbn:se:uu:diva-159519 (URN)978-91-554-8240-4 (ISBN)
Public defence
2012-02-03, Häggsalen, Ångströmslaboratoriet, Lägerhyddsvägen 1, Uppsala, 10:15 (English)
Opponent
Supervisors
Available from: 2012-01-12 Created: 2011-10-03 Last updated: 2012-01-16Bibliographically approved
2. Submerged Transmission in Wave Energy Converters: Full Scale In-Situ Experimental Measurements
Open this publication in new window or tab >>Submerged Transmission in Wave Energy Converters: Full Scale In-Situ Experimental Measurements
2012 (English)Doctoral thesis, comprehensive summary (Other academic)
Abstract [en]

Different wave power technologies are in development around the world in different stages of prototype testing. So far only a few devices have been deployed offshore at full scale for extended periods of time. Little data is published about how these different devices perform.

This thesis presents results from experiments with the full-scale offshore wave energy converters at the Lysekil research site on the Swedish west coast. The theories, experiments, measurements, performance evaluations and developments of the submerged transmission in the direct driven permanent magnet linear generator are in focus. The reciprocating submerged transmission fulfills the purpose of transmitting the absorbed mechanical wave energy through the capsule wall into the generator, while preventing the seawater from entering the capsule and reducing the life time of the converter.

A measuring system with seven laser triangulation sensors has been developed to measure small relative displacements between piston rod and seal housing in the submerged transmission with excellent accuracy for the purpose of evaluating both functional behavior and successive wear in-situ. A method for calculating relative tilt angles, azimuth angles, differential tilt angles, and successive wear in the submerged transmission has been developed. Additional sensors systems have been installed in the converter enabling correlation and a thorough investigation into the operating conditions of the transmission and the converter. The thesis presents unique results from the measurements. A data acquisition system transmits the signals from the converter on the seabed to an onshore measuring station. Results are presented in time-, frequency- and the time-frequency domain.

The results have given important information for further development of the submerged transmission, which is important to the survivability of the system. The thesis describes the status of research, and is a step that may influence future designs of wave energy devices for reaching survivability and a cost-effective renewable energy system.

Place, publisher, year, edition, pages
Uppsala: Acta Universitatis Upsaliensis, 2012. 214 p.
Series
Digital Comprehensive Summaries of Uppsala Dissertations from the Faculty of Science and Technology, ISSN 1651-6214 ; 961
Keyword
Wave energy converter, direct drive, submerged transmission, piston rod, seal housing, sealing system, laser triangulation sensor, offshore measurements, relative displacement, vibrations, tilt angle, tilting, wear estimation.
National Category
Energy Systems Marine Engineering Ocean and River Engineering Energy Engineering
Research subject
Engineering Science with specialization in Science of Electricity
Identifiers
urn:nbn:se:uu:diva-179740 (URN)978-91-554-8440-8 (ISBN)
Public defence
2012-09-14, Polhemssalen, Ångströmlaboratoriet, Lägerhyddsvägen 1, Uppsala, 10:00 (English)
Opponent
Supervisors
Projects
The Lysekil Wave Power Project
Note

Published is a preprint version of the full text and should be combined by the errata.

Available from: 2012-08-24 Created: 2012-08-21 Last updated: 2013-01-22Bibliographically approved
3. Experimental results from the Lysekil Wave Power Research Site
Open this publication in new window or tab >>Experimental results from the Lysekil Wave Power Research Site
2012 (English)Doctoral thesis, comprehensive summary (Other academic)
Abstract [en]

This thesis presents how experimental results, from wave power research performed offshore at the Lysekil research site, were obtained. The data were used to verify theoretical models as well as evaluate the feasibility of wave power as a future sustainable energy source.

The first experiments carried out at the research site was the measurement of the force in a line where one end was connected to a buoy with a diameter of 3 m and the other end to a set of springs with limited stroke length. The system is exposed to high peak forces compared to average forces. The maximum measured force in the line, when the buoy motion is limited by a stiff stopper rope is ten times the average force in that particular sea state.

The experiment performed on the first wave energy converter tested at the Lysekil Research Site is described. The infrastructure of the site is presented where the central connection point is the measuring station. The key finding is that it is possible to transform the motions of ocean waves into electrical energy and distribute it to land.

Many wave energy converters must be interconnected if large amounts of energy are to be harvested from the waves. The first submerged substation intended for aggregation of energy from wave power converters is described, with focus on the measurement and control system placed inside the substation. During this experiment period the generators were equipped with many different sensors; these measurements are explained in the thesis.

The system that aggregates power from the studied wave energy converter is regularly exposed to peak power of up to 20 times the maximum average output from the converter.

Vertical and horizontal movement of the buoy has been measured in different ways. The result is that the vertical displacement of the buoy can be measured with a simple accelerometer circuit but it is much more complicated to measure the horizontal displacement. A special method for measuring the horizontal displacement has been implemented by measuring the strain in the enclosure and the force in the line.

Abstract [sv]

Den här avhandlingen berättar om hur experimenten vid Lysekils forskningsområde för vågkraft har utförts. Insamlade mätdata har använts för att verifiera teoretiska samband som modulerats vid Elektricitetslära, Uppsala universitet. De teoretiska och praktiska resultaten har visat på att vågkraft har förutsättningarna att implementeras som en hållbar framtida energikälla. Intressanta mätmetoder har utvecklas och påfrestningarna  på utrustningin och dess samband med medel effekten har studerats.

Place, publisher, year, edition, pages
Uppsala: Acta Universitatis Upsaliensis, 2012. 101 p.
Series
Digital Comprehensive Summaries of Uppsala Dissertations from the Faculty of Science and Technology, ISSN 1651-6214 ; 957
Keyword
Wave power, Lysekil, Marine Substation, Offshore measurement, strain gauge, lateral force, Invlination and azimuth angles, Wave energy converter, Temperature measurements, Inverter, Energy, Control sustem, CompactRIO, Vågkraft, Mätteknik, Styrsystem, Lysekil
National Category
Marine Engineering Energy Systems Other Electrical Engineering, Electronic Engineering, Information Engineering Ocean and River Engineering Control Engineering
Research subject
Engineering Science
Identifiers
urn:nbn:se:uu:diva-179098 (URN)978-91-554-8433-0 (ISBN)
Public defence
2012-09-28, Polhem Å 10134, Ångströmlaboratoriet, Lägerhyddsvägen 1, Uppsala, 13:00 (English)
Opponent
Supervisors
Projects
Lysekils projektet
Funder
Swedish Research Council, grant no. 621-2009-3417
Available from: 2012-09-05 Created: 2012-08-07 Last updated: 2013-01-22
4. Buoy Geometry, Size and Hydrodynamics for Power Take Off Device for Point Absorber Linear Wave Energy Converter
Open this publication in new window or tab >>Buoy Geometry, Size and Hydrodynamics for Power Take Off Device for Point Absorber Linear Wave Energy Converter
2014 (English)Doctoral thesis, comprehensive summary (Other academic)
Abstract [en]

Wave energy converters of point absorber type have been developed and constructed. Full scale experiments have been carried out at sea and electricity has been successfully delivered. Linear permanent magnet generators together with a subsea substation and buoys of various geometric shapes have been investigated theoretically and experimentally. The design has in large extent an electronic approach, keeping the mechanical part of it as simple as possible, due to the long life span and reliability of electric components.

Because of the nature of a linear generator, the internal translator with permanent magnets has a limited stroke length which will be reached when the buoy is exposed to large wave heights. Internal springs at the top and bottom of the generator prevent the translator from hitting the generator hull. Inertial forces due to the mass and velocity of the translator and the buoy and its heave added mass compresses the spring. The added mass is a rather large part of the total moving mass. Simulations of a converter with a vertical cylindrical buoy and with a toroidal buoy were conducted, as well as real sea experiments with converters with cylindrical buoys of two different sizes and a toroidal buoy. The overloads are likely to affect the design and service life of the generator, the buoy and the wire which interconnects them.

Buoy shapes with as much excitation force as possible and as little heave added mass as possible were sought. A toroidal buoy caused less overloads on the generator at sea states with short wave periods and relatively large wave height, but for sea states with very long wave periods or extremely high waves, the magnitude of the overloads was mainly determined by the maximum displacement of the buoy.

Snap loads on the interconnecting wire, as the slack wire tensed up after a very deep wave trough, were found to be greater but of the same order of magnitude as forces during the rest of the wave cycle.

During a 4 day period at various wave conditions, two converters with cylindrical buoys proved efficiency between 11.1 % and 24.4 %. The larger buoy had 78 % larger water plane area than the other buoy which resulted in 11 % more power production. Short wave period was beneficial for the power production.

Infinite frequency heave added mass was measured for a cylindrical buoy at real sea and found to be greater than the linearly calculated theoretical added mass.

Place, publisher, year, edition, pages
Uppsala: Acta Universitatis Upsaliensis, 2014. 71 p.
Series
Digital Comprehensive Summaries of Uppsala Dissertations from the Faculty of Science and Technology, ISSN 1651-6214 ; 1130
Keyword
point absorber, wave, energy, converter, ocean, wec, toroidal, buoy, torus, cylindrical, cylinder, experiment, full scale, trial, sea, energy, renewable
National Category
Energy Engineering Fluid Mechanics and Acoustics
Research subject
Engineering Science with specialization in Science of Electricity
Identifiers
urn:nbn:se:uu:diva-220344 (URN)978-91-554-8902-1 (ISBN)
Public defence
2014-04-28, Häggsalen, Ångströmlaboratoriet, Lägerhyddsvägen 1, Uppsala, 13:15 (English)
Opponent
Supervisors
Available from: 2014-04-04 Created: 2014-03-13 Last updated: 2014-09-18Bibliographically approved

Open Access in DiVA

No full text

Authority records BETA

Gravråkmo, HalvarLeijon, MatsStrömstedt, ErlandEngström, JensTyrberg, SimonSavin, AndrejSvensson, OlleWaters, Rafael

Search in DiVA

By author/editor
Gravråkmo, HalvarLeijon, MatsStrömstedt, ErlandEngström, JensTyrberg, SimonSavin, AndrejSvensson, OlleWaters, Rafael
By organisation
Electricity
Engineering and Technology

Search outside of DiVA

GoogleGoogle Scholar

urn-nbn

Altmetric score

urn-nbn
Total: 850 hits
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • ieee
  • modern-language-association
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf