uu.seUppsala University Publications
Change search
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • ieee
  • modern-language-association
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf
Grid planning with a large amount of small scale solar power
Uppsala University, Disciplinary Domain of Science and Technology, Technology, Department of Engineering Sciences.
2013 (English)Independent thesis Advanced level (professional degree), 20 credits / 30 HE creditsStudent thesis
Abstract [en]

With an increasing interest for renewable power, photovoltaics (PV) have becomemore and more common in the distribution network. If a customer wants to install aPV system, or another type of distributed generation (DG), the distribution systemoperators (DSO) needs a good way to determine if it the grid can handle it or not. InSweden, a guideline to aid the DSO was published in 2011. However, this guidelineonly considers one connection without considering other DG units. This project isabout developing new guidelines for DG connections in grids with a large number ofDG units. Based on a literature study it has been concluded that one of the mostcritical issue is over-voltage, which is the main focus of this project.

Two new methods have been developed; the first proposed method is based onneglecting reactance and losses in the grid, a simple linear relationship between thevoltage level, the resistance in the lines, and the installed power is obtained. Thisrelationship is then used to calculate the voltage level at critical points in the grid. Thesecond method is to find the weakest bus, with a connected DG unit. By assumingthat all power is installed at that point we get a very simple guideline; it is veryconservative but can be used before the first method.

A simulation tool has been developed in order to analyze the voltage level in grids forvarious cases with connected DG units. The simulated results have proven that theproposed guidelines are, when considering voltage issues, very reliable and can beuseful. However, further work needs to be done to ensure that other problems donot occur.

Place, publisher, year, edition, pages
2013. , 65 p.
Series
UPTEC F, ISSN 1401-5757 ; 13005
Keyword [en]
Grid planning, Distribution grid, Distributed generation, Photovoltaics, Over-voltage
National Category
Energy Systems
Identifiers
URN: urn:nbn:se:uu:diva-199060OAI: oai:DiVA.org:uu-199060DiVA: diva2:619378
External cooperation
Vattenfall Research and Development AB
Educational program
Master Programme in Engineering Physics
Uppsok
Technology
Supervisors
Examiners
Available from: 2013-05-03 Created: 2013-05-03 Last updated: 2013-05-17Bibliographically approved

Open Access in DiVA

fulltext(3774 kB)193 downloads
File information
File name FULLTEXT02.pdfFile size 3774 kBChecksum SHA-512
0f45b4f7171f0f3c31d14a35e3c7849ffe9fcb3dc98903550b7032e3c10d1fc3e88ab59be449cec6dc75a5d4d0ba9c60bcd7c14b3b6d40f48fbc66866f76fb97
Type fulltextMimetype application/pdf

By organisation
Department of Engineering Sciences
Energy Systems

Search outside of DiVA

GoogleGoogle Scholar
Total: 197 downloads
The number of downloads is the sum of all downloads of full texts. It may include eg previous versions that are now no longer available

urn-nbn

Altmetric score

urn-nbn
Total: 600 hits
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • ieee
  • modern-language-association
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf