uu.seUppsala University Publications
Change search
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • ieee
  • modern-language-association
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf
Offshore Deployment of Point Absorbing Wave Energy Converters with a Direct Driven Linear Generator Power Take-Off at the Lysekil Test Site
Uppsala University, Disciplinary Domain of Science and Technology, Technology, Department of Engineering Sciences, Electricity.
Uppsala University, Disciplinary Domain of Science and Technology, Technology, Department of Engineering Sciences, Electricity.
Uppsala University, Disciplinary Domain of Science and Technology, Technology, Department of Engineering Sciences, Electricity.
2014 (English)In: 33Rd International Conference On Ocean, Offshore And Arctic Engineering, 2014, Vol 9A: Ocean Renewable Energy, 2014Conference paper, Published paper (Refereed)
Abstract [en]

Within the year 2013, four linear generators with point absorber buoy systems were deployed in the Lysekil test site. Until now, deployments of these point absorbing wave energy converters have been expensive, time consuming, complicated and raised safety issues. In the present paper, we focus on the analysis and optimization of the offshore deployment process of wave energy converters with a linear generator power take-off which has been constructed by Uppsala University. To address the crucial issues regarding the deployment difficulties, case study of previous offshore deployments at the Lysekil test site are presented regarding such parameters as safety, cost and time efficiency. It was discovered that the deployment process can be improved significantly, mainly by using new technologies, e.g., new specialized deployment vessels, underwater robots for inspections and for connecting cables and an automatized pressurizing process. Addressing the main deployment difficulties and constrains leads us to discovery of methods that makes offshore deployments more cost-efficient and faster, in a safety context.

Place, publisher, year, edition, pages
2014.
National Category
Electrical Engineering, Electronic Engineering, Information Engineering Ocean and River Engineering
Research subject
Engineering Science with specialization in Science of Electricity
Identifiers
URN: urn:nbn:se:uu:diva-222445DOI: 10.1115/OMAE2014-23396ISI: 000363499000023ISBN: 978-0-7918-4553-0 (print)OAI: oai:DiVA.org:uu-222445DiVA: diva2:711915
Conference
Proceedings of the 33rd International Conference on Ocean, Offshore and Arctic Engineering, ASME 2014
Available from: 2014-04-11 Created: 2014-04-10 Last updated: 2016-01-12Bibliographically approved

Open Access in DiVA

No full text

Other links

Publisher's full text

Authority records BETA

Chatzigiannakou, Maria A.Dolguntseva, IrinaLeijon, Mats

Search in DiVA

By author/editor
Chatzigiannakou, Maria A.Dolguntseva, IrinaLeijon, Mats
By organisation
Electricity
Electrical Engineering, Electronic Engineering, Information EngineeringOcean and River Engineering

Search outside of DiVA

GoogleGoogle Scholar

doi
isbn
urn-nbn

Altmetric score

doi
isbn
urn-nbn
Total: 428 hits
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • ieee
  • modern-language-association
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf