uu.seUppsala University Publications
Change search
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • ieee
  • modern-language-association
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf
Förutsättningar och hinder för att använda offentlig upphandling som styrmedel för en hållbar hantering av entreprenadberg
Uppsala University, Disciplinary Domain of Science and Technology, Technology, Department of Engineering Sciences, Industrial Engineering & Management.
2014 (Swedish)Independent thesis Advanced level (degree of Master (Two Years)), 20 credits / 30 HE creditsStudent thesisAlternative title
Public procurement as an instrument for sustainable management of excavated rock (English)
Abstract [en]

Large volumes of excavated soil and rock are generated in building- and construction projects. These materials need to be transported longer and longer distances due to the densifications of cities. The transportation affects the environment in terms of noise and emissions, but also makes high demands on road infrastructure. To reduce the transport distances an increased responsibility for the excavated rock generated needs to be taken. Responsibility can be increased through an introduction of means of control. Previous studies describe public procurement as an effective tool to increase the responsibility taken by public authorities. Public procurement is regulated by law but the inclusive of environmental requirements is optional, which makes procurement as a tool flexible. The aim of this thesis is to examine public procurement as a tool to control and reduce the environmental impacts from handling, and specifically transporting excavated rock generated in municipal construction projects. The study consists of a case study conducted in Södertörns eight municipalities and a wider analysis that has been carried out in the regions of Stockholm, Västra Götaland and Skåne. The two studies showed that municipal officials generally do not believe that the handling of excavated rock is a municipal responsibility, it lies in the entrepreneurs self-interest to implement regional mass balances. Entrepreneurs instead, consider it to be a municipal problem that can be resolved only when the municipality begins to take responsibility for the excavated rock generated, by example through developing regional plans. As in previous studies, the result indicates that the supplier and purchaser consider the environmental requirements in the procurement process differently. The thesis identify four different factors, which limits the municipalities ability and willingness to take more responsibility in the procurement process regarding the matter excavated rock from construction. These factors are different political position, short term planning, centralization of the procurement units and lack of national and municipal regulations. The study presents that the knowledge in municipal procurement entities is low when it comes to the handling of excavated rock from municipal construction projects. The major knowledge gaps are probably due to the fact that excavated rock for a long time has been seen as an unwanted issue and interest in managing their materials has therefore been low. The knowledge gap must be decreased before the municipalities are able to develop an ethical maturity and take more responsibility in the management of excavated rock. Increased dialogue between different municipal sections and other stakeholders may increase the knowledge.

Place, publisher, year, edition, pages
2014. , 73 p.
Series
TVE, 14 035
Keyword [en]
public procurement, green public procurement, excavated rock, CSR, responsibility, sustainability
Keyword [sv]
offentlig upphandling, grön offentlig upphandling, entreprenadberg, CSR, ansvarstagande, hållbarhet
National Category
Engineering and Technology
Identifiers
URN: urn:nbn:se:uu:diva-228407OAI: oai:DiVA.org:uu-228407DiVA: diva2:733958
External cooperation
Ecoloop AB
Educational program
Master Programme in Industrial Management and Innovation
Supervisors
Examiners
Projects
OptiMass
Available from: 2014-08-11 Created: 2014-07-12 Last updated: 2014-08-25Bibliographically approved

Open Access in DiVA

fulltext(1839 kB)340 downloads
File information
File name FULLTEXT02.pdfFile size 1839 kBChecksum SHA-512
c84808f10c651d1bd6c48865ae3e2ee12eafc9f350688ee2fc54c65a272e3ad6915d64f2a81708f7ef10234241573db8725a46cd8adf1c3c477f1f9078ee0050
Type fulltextMimetype application/pdf

By organisation
Industrial Engineering & Management
Engineering and Technology

Search outside of DiVA

GoogleGoogle Scholar
Total: 342 downloads
The number of downloads is the sum of all downloads of full texts. It may include eg previous versions that are now no longer available

urn-nbn

Altmetric score

urn-nbn
Total: 972 hits
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • ieee
  • modern-language-association
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf