uu.seUppsala University Publications
Change search
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • ieee
  • modern-language-association
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf
An Assessment of the Discrepancy Between Operational Assessment and Wind Resource Assessment for a Wind Farm in Ireland
Uppsala University, Disciplinary Domain of Science and Technology, Earth Sciences, Department of Earth Sciences.
2014 (English)Independent thesis Advanced level (degree of Master (One Year)), 10 credits / 15 HE creditsStudent thesis
Abstract [en]

An accurate wind resource assessment (WRA) is crucial in energy prediction as the power is directly proportional to the wind speed cubed. This thesis analyses the discrepancy between operational assessment and WRA for a wind farm located on a moderately complex terrain in Ireland. As part of this research, a WRA was undertaken and the results were input to two wind farm design tools, WindPro and WindSim, to estimate the annual energy production.

Two and a half years of data was available from a 50m met mast. The data was analysed and filtered to ascertain and limit the usage of erroneous data. The dataset was then correlated with an available online dataset utilising the Measure Correlate Predict (MCP) module in WindPro in order to estimate the long term wind resource at the site.

The wind resource was then used to determine the annual energy produced at the site using both WindPro and WindSim. A loss of 8% was applied to the energy calculations for comparison with the original WRA.

The results demonstrate the energy production from the original energy prediction, undertaken by a leading wind consultancy prior to construction, was overestimated by an average 10.19% over the three years of operation. The averaged wind speed at hub height in the original WRA was 8.2m/s. However, the prediction undertaken using WindPro in this study estimated an average hub height wind speed of 8.0m/s while WindSim estimated an average of 7.36m/s. These differing results had a significant contribution to the difference in Annual Energy Production (AEP).

The calculated annual energy results were an overestimation of energy production by an average of 8.10% utilising WindPro, while WindSim underestimated the energy output by just 0.11%.

Place, publisher, year, edition, pages
2014. , 59 p.
Keyword [en]
Wind Resource Assessment, WindSim, WindPro, WAsP, Wind Energy, CFD
National Category
Energy Systems
Identifiers
URN: urn:nbn:se:uu:diva-237332OAI: oai:DiVA.org:uu-237332DiVA: diva2:767457
Educational program
Master Programme in Wind Power Project Management
Supervisors
Examiners
Available from: 2014-12-02 Created: 2014-12-01 Last updated: 2014-12-02Bibliographically approved

Open Access in DiVA

fulltext(2368 kB)484 downloads
File information
File name FULLTEXT01.pdfFile size 2368 kBChecksum SHA-512
b33f0ed3cc291c54f08b796bdc21a25e86a19bc993fc0394a1cb3f9f6c1516dd21fcf86fdf235276621ada8594ada24370617df63649ab29d524ec3b1d1a0b30
Type fulltextMimetype application/pdf

By organisation
Department of Earth Sciences
Energy Systems

Search outside of DiVA

GoogleGoogle Scholar
Total: 484 downloads
The number of downloads is the sum of all downloads of full texts. It may include eg previous versions that are now no longer available

urn-nbn

Altmetric score

urn-nbn
Total: 767 hits
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • ieee
  • modern-language-association
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf