BIM-PROJEKTERING FÖRFÖRBÄTTRAD LOGISTIK
Uppsala University, Disciplinary Domain of Science and Technology, Technology, Department of Engineering Sciences, Applied Mechanics, Byggteknik.
Uppsala University, Disciplinary Domain of Science and Technology, Technology, Department of Engineering Sciences, Applied Mechanics, Byggteknik.
2015 (Swedish)Independent thesis Basic level (professional degree), 10 credits / 15 HE creditsStudent thesisAlternative title
BIM-planning for improved logistics (English)
Abstract [en]

The construction industry depends on functioning logistics; if the logistics isn’tworking the construction site will risk to be interrupted due to material shortages orproblems with deliveries. Despite this, the construction industry is battling logisticproblems daily. This problem is very time consuming and costly for the companies.These theses are written for Peab Bostadsproduktion and investigate if it is possibleto focus on logistics earlier in the building planning process to reduce the problemsthat occur. Peab has partnerships with three companies that could be helpful for themin the work of reducing logistic problems. These three companies are Vico, BEAst andBIMobject.The thesis first section gives a general review of logistics, as well as the conceptsrelated to it. A general review of the above named partners is also given. In the firstsection the meaning of BIM is also explained. The core of the thesis consists of asurvey with craftsman from one of Peabs construction sites. The other main part isinterviews with officials from both the production side and from Peabs headquarters.The survey and the interviews have then been collected and analyzed. Based on theresult that was gathered, suggestions and solutions are presented and discussed.The work shows that many of the logistical problems that occur can be reduced orcompletely prevented by implementing these three in all Peabs own managementbuilds.

Place, publisher, year, edition, pages
2015. , 38 p.
Keyword [sv]
BIM, projektering, logistik, bygglogistik
National Category
Construction Management
Identifiers
URN: urn:nbn:se:uu:diva-257589ISRN: UTH-INGUTB-EX-B-2015/18-SEOAI: oai:DiVA.org:uu-257589DiVA: diva2:839943
External cooperation
Peab
Educational program
Bachelor Programme in Construction Engineering
Supervisors
Examiners
Available from: 2015-07-06 Created: 2015-07-06 Last updated: 2015-07-06Bibliographically approved

Open Access in DiVA

fulltext(1539 kB)293 downloads
File information
File name FULLTEXT01.pdfFile size 1539 kBChecksum SHA-512
6112f33ac0ccc4d996305c65c88e4c4abad97f0fca91833f40da295d4decb06232b6317b07e5939b400f55c24af9e7ead9a7590b8e4d94ac608e5558bc1d5580
Type fulltextMimetype application/pdf

By organisation
Byggteknik
Construction Management

Search outside of DiVA

GoogleGoogle Scholar
Total: 293 downloads
The number of downloads is the sum of all downloads of full texts. It may include eg previous versions that are now no longer available

urn-nbn

Altmetric score

urn-nbn
Total: 1835 hits
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • ieee
  • modern-language-association
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf