uu.seUppsala University Publications
Change search
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • ieee
  • modern-language-association
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf
Digitaliserade Förvaltningslösningar med BIM: En utvärdering av ett pilotprojekt i samarbete med Tyréns AB
Uppsala University, Disciplinary Domain of Science and Technology, Technology, Department of Engineering Sciences, Applied Mechanics, Byggteknik.
Uppsala University, Disciplinary Domain of Science and Technology, Technology, Department of Engineering Sciences, Applied Mechanics, Byggteknik.
2015 (Swedish)Independent thesis Basic level (professional degree), 10 credits / 15 HE creditsStudent thesis
Abstract [en]

Using BIM to streamline performance of duties has great potential. This is being

realized in an increasing number of companies. In the construction industry the

concept of BIM is not new, although actually implementing BIM within a facility

management company has thus far been rare.

In order to provide guidance and information related to how an implementation of

BIM could look within an organization, an initiative called "BIM i staten" was launched

by five government based constructors.

A pilot project has been initiated by the consulting company Tyréns that deals with an

implementation of BIM in the facility management operations of their office building in

Stockholm. On this basis, this following report aims to evaluate this pilot project

based on the documentation which can be found in “BIM i staten”.

The goal of this thesis is to show to which extent the system functions of the BIM and

facility management systems used within the pilot project coincide with the system

functions described in “BIM i staten”. Furthermore, the goal is to produce

recommendations for Tyréns’ continued work with regard to adjustments of the

systems.

The result shows that the systems in the project coincides with 50% of the features

that the criteria describe and that further 23% of the features within the project do

not fully comply with the criteria. The remaining system features are not yet available.

The recommendations primarily focus on the system called Maint3D and the facility

management information that is made available.

Place, publisher, year, edition, pages
2015.
National Category
Other Engineering and Technologies not elsewhere specified
Identifiers
URN: urn:nbn:se:uu:diva-260195ISRN: UTH-INGUTB-EX-B-2015/27-SEOAI: oai:DiVA.org:uu-260195DiVA: diva2:846618
Educational program
Bachelor Programme in Construction Engineering
Supervisors
Examiners
Available from: 2015-08-18 Created: 2015-08-17 Last updated: 2015-08-18Bibliographically approved

Open Access in DiVA

fulltext(1828 kB)274 downloads
File information
File name FULLTEXT01.pdfFile size 1828 kBChecksum SHA-512
c24528d21f014034868272fc42b0780701b5b0a48f232dcace739b65d4337ad07b9e58d8ba9b340e80d72b43ee816b79162ee40bf1ab31c9973255bf04428d0f
Type fulltextMimetype application/pdf

Search in DiVA

By author/editor
Hellström, SebastianLamti, Emir
By organisation
Byggteknik
Other Engineering and Technologies not elsewhere specified

Search outside of DiVA

GoogleGoogle Scholar
Total: 274 downloads
The number of downloads is the sum of all downloads of full texts. It may include eg previous versions that are now no longer available

urn-nbn

Altmetric score

urn-nbn
Total: 905 hits
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • ieee
  • modern-language-association
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf