Analys av underhållsarbeten: En studie om referenstider och förbättringsförslagför underhållsarbeten
Uppsala University, Disciplinary Domain of Science and Technology, Technology, Department of Engineering Sciences, Industrial Engineering & Management.
2016 (Swedish)Independent thesis Basic level (professional degree), 10 credits / 15 HE creditsStudent thesis
Abstract [en]

The purpose of this thesis is to identify and investigate reference times for regularmaintenance work activities at the department responsible for maintenance ofunderground loaders at company LKAB:s mine in Kiruna, Sweden. The study is athesis of 15 credits at Uppsala University and has been carried out over 10 weeksduring the spring 2016. The majority of the work has been carried out on site.

For a long time the underground loaders department has been struggling withrecurring breakdowns. Which affect the production in the mine and is a burden forthe maintenance personal. To live up to the expectations of the customer and be ableto plan the work procedures with better precision the department now wants to geta better picture of how much the planning of the maintenance work affects thedepartment, both in time and costs. The goal with the study is to proposeimprovements of how to minimize the time for maintenance work.

The study has looked at internal statistics from 2015 and used it to map out whichactivities that have the biggest influence on the department. The first selectionresulted in six procedures which are carried out on the two types of loaders from SANDVIK that the company uses. The chosen activities are bucket replacement, tiltcylinder replacement, lift cylinder replacement and front and rear axle replacement.Due to the limitation of time for the study one of these six activities were chosen fora deeper analysis. The choice, after discussion with the mentor Sandy Doull at LKAB,fell on front and rear axle replacement.

The conclusion after the study is that there are big opportunities for improvementsfor the department responsible for the underground loaders at LKAB. Workingactively with follow ups and implementing the Lean tool 5S they can reduce waste,variation and to improve productivity for all the work procedures. Improvements thatcould lead to big economic profits by reducing downtime in production and improveworking conditions for maintenance personal during the work procedures.

Place, publisher, year, edition, pages
2016. , 33 p.
Keyword [sv]
Lean, haverier, underhåll, arbetsmoment, standardtider, referenstider, förbättringar, 5S
National Category
Reliability and Maintenance Production Engineering, Human Work Science and Ergonomics
URN: urn:nbn:se:uu:diva-296244ISRN: UTH-INGUTB-EX-M-2016/17-SEOAI: oai:DiVA.org:uu-296244DiVA: diva2:936897
External cooperation
Educational program
Bachelor Programme in Mechanical Engineering
Available from: 2016-06-16 Created: 2016-06-14 Last updated: 2016-06-16Bibliographically approved

Open Access in DiVA

fulltext(3280 kB)52 downloads
File information
File name FULLTEXT01.pdfFile size 3280 kBChecksum SHA-512
Type fulltextMimetype application/pdf

By organisation
Industrial Engineering & Management
Reliability and MaintenanceProduction Engineering, Human Work Science and Ergonomics

Search outside of DiVA

GoogleGoogle Scholar
Total: 52 downloads
The number of downloads is the sum of all downloads of full texts. It may include eg previous versions that are now no longer available

Total: 119 hits
ReferencesLink to record
Permanent link

Direct link