Utökade dimensioneringskrav från en förhöjd installationsgrad av distribuerade solcellssystem
Uppsala University, Disciplinary Domain of Science and Technology, Technology, Department of Engineering Sciences, Solid State Physics.
2016 (Swedish)Independent thesis Advanced level (professional degree), 20 credits / 30 HE creditsStudent thesisAlternative title
Increased dimensioning requirements from an elevated degree of installed distributed photovoltaics (English)
Abstract [en]

This study aims to examine the hosting capacity (the maximum amount of distributed generation possible to add to a current grid) of Mälarenergi’s distribution networks. The three areas examined are a rural network, a modern suburban grid and an older suburban grid. The networks are modelled in PowerWorld Simulator with data mainly from Mälarenergi’s NIS (Network Information System). The basic models include calculated minimum loads based on load profiles, combined with 0 kW, 2 kW, 4kW or 5 kW installed photovoltaics (PV) systems at each consumer. The compensating models are based on the previous ones but with reduced transformer voltages to lower the risk of grid over-voltages. A high load case is also examined to make sure there are no under-voltages for these models.

The results show that the rural network is strong enough to handle the biggest available PV system at 5 kW, if the transformer voltage is lowered from 1.03 p.u. to 1.005 p.u. The modern suburban grid can host 4 kW solar panels together with a lowered voltage level of 1.005 p.u. The larger package of 5 kW leads to overloading at the transformer when used. The older suburban grid has the largest issues with both overvoltages and overloading and can only handle 2 kW distributed generation with a voltage reduction to 1.005 p.u. The models are fairly sensitive because of assumed transfomer parameters and, in the case of the modern suburban grid, some lines being removed due to limitations in the software. Regardless, the results are robust enough that they can be considered correct.

Place, publisher, year, edition, pages
2016. , 50 p.
UPTEC ES, ISSN 1650-8300 ; 16010
Keyword [sv]
dimensioneringskrav, distribuerade solcellssystem, hosting capacity, överbelastning, överspänning
National Category
Energy Systems Engineering and Technology
URN: urn:nbn:se:uu:diva-296520OAI: oai:DiVA.org:uu-296520DiVA: diva2:938768
External cooperation
Mälarenergi AB
Educational program
Master Programme in Energy Systems Engineering
Available from: 2016-06-17 Created: 2016-06-17 Last updated: 2016-06-17Bibliographically approved

Open Access in DiVA

fulltext(1526 kB)73 downloads
File information
File name FULLTEXT01.pdfFile size 1526 kBChecksum SHA-512
Type fulltextMimetype application/pdf

By organisation
Solid State Physics
Energy SystemsEngineering and Technology

Search outside of DiVA

GoogleGoogle Scholar
Total: 73 downloads
The number of downloads is the sum of all downloads of full texts. It may include eg previous versions that are now no longer available

Total: 1217 hits
ReferencesLink to record
Permanent link

Direct link