uu.seUppsala universitets publikationer
Ändra sökning
Avgränsa sökresultatet
12345 51 - 100 av 211
RefereraExporteraLänk till träfflistan
Permanent länk
Referera
Referensformat
  • apa
  • ieee
  • modern-language-association
  • vancouver
  • Annat format
Fler format
Språk
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Annat språk
Fler språk
Utmatningsformat
  • html
  • text
  • asciidoc
  • rtf
Träffar per sida
  • 5
  • 10
  • 20
  • 50
  • 100
  • 250
Sortering
  • Standard (Relevans)
  • Författare A-Ö
  • Författare Ö-A
  • Titel A-Ö
  • Titel Ö-A
  • Publikationstyp A-Ö
  • Publikationstyp Ö-A
  • Äldst först
  • Nyast först
  • Skapad (Äldst först)
  • Skapad (Nyast först)
  • Senast uppdaterad (Äldst först)
  • Senast uppdaterad (Nyast först)
  • Disputationsdatum (tidigaste först)
  • Disputationsdatum (senaste först)
  • Standard (Relevans)
  • Författare A-Ö
  • Författare Ö-A
  • Titel A-Ö
  • Titel Ö-A
  • Publikationstyp A-Ö
  • Publikationstyp Ö-A
  • Äldst först
  • Nyast först
  • Skapad (Äldst först)
  • Skapad (Nyast först)
  • Senast uppdaterad (Äldst först)
  • Senast uppdaterad (Nyast först)
  • Disputationsdatum (tidigaste först)
  • Disputationsdatum (senaste först)
Markera
Maxantalet träffar du kan exportera från sökgränssnittet är 250. Vid större uttag använd dig av utsökningar.
  • 51.
    Espadas-Escalante, Juan José
    et al.
    Uppsala universitet, Teknisk-naturvetenskapliga vetenskapsområdet, Tekniska sektionen, Institutionen för teknikvetenskaper, Tillämpad mekanik.
    van Dijk, Nico P.
    Uppsala universitet, Teknisk-naturvetenskapliga vetenskapsområdet, Tekniska sektionen, Institutionen för teknikvetenskaper, Tillämpad mekanik, Byggteknik.
    Isaksson, Per
    Uppsala universitet, Teknisk-naturvetenskapliga vetenskapsområdet, Tekniska sektionen, Institutionen för teknikvetenskaper, Tillämpad mekanik.
    The effect of free-edges and layer shifting on intralaminar and interlaminar stresses in woven composites2018Ingår i: Composite structures, ISSN 0263-8223, E-ISSN 1879-1085, Vol. 185, s. 212-220Artikel i tidskrift (Refereegranskat)
    Abstract [en]

    The free-edge effects and relative layer shifting in the interlaminar and intralaminar stresses of plain woven composite laminates under uniaxial extension is investigated numerically using a finite element approach. A computational framework of the free-edge problem for periodic structures with finite width is applied to woven laminates. First, two-layered laminates with three different shifting configurations are studied considering repeating unit cells simulating finite and infinite width. For each configuration, two different widths are considered by trimming the model at different locations in order to investigate different free-edge effects. Then, two four-layered laminates with no shifting and a maximum shifting configuration are analyzed to illustrate the effect of neighboring layers in the stresses. For each shifting configuration, different delamination mechanisms are expected. When considering more layers, it is found that the stacking configuration affects the state of stress and the free-edge effects depending on the shifting. In general, a different behavior than that of unidirectional tape laminates is found, since the interlaminar and intralaminar stresses can be higher than those generated at the free-edges. Particularly, for the maximum shifting configuration results are in agreement with experimental results in the literature where no debonding between yarns was observed at the free-edges.

  • 52.
    Fachrizal, Reza
    et al.
    Uppsala universitet, Teknisk-naturvetenskapliga vetenskapsområdet, Tekniska sektionen, Institutionen för teknikvetenskaper, Tillämpad mekanik, Byggteknik.
    Munkhammar, Joakim
    Uppsala universitet, Teknisk-naturvetenskapliga vetenskapsområdet, Tekniska sektionen, Institutionen för teknikvetenskaper, Tillämpad mekanik, Byggteknik.
    Increasing the photovoltaic self-consumption and reducing peak loads in residential buildings with electric vehicle smart charging2019Konferensbidrag (Övrigt vetenskapligt)
    Abstract [en]

    This paper presents an electric vehicle (EV) smart charging scheme at residential buildings based on installed photovoltaic (PV) output and household electricity consumption. The proposed EV charging scheme is designed to determine the optimal EV charging schedules for the purpose of minimizing the load variance or flattening the load profile. When the net-load is taken into account in the smart charging scheme, not only the peak load can be reduced, but also the PV self-consumption in the building can be increased. The charging scheduling problem is formulated and solved with a quadratic programming approach. The departure and arrival time and the distance covered by vehicle in each trip are specifically modelled based on available statistic data from Swedish travel survey. The scheme is applied on simulated typical Swedish detached houses without electric heating. The aggregation of distributed smart charging in multiple housesis conducted and compared to the smart charging in a single house. Numerical results are presented to show the effectiveness of the proposed smart charging scheme. Positive results on both the PV self-consumption and the peak load reduction are achieved.

  • 53.
    Falk, Rasmus
    Uppsala universitet, Teknisk-naturvetenskapliga vetenskapsområdet, Tekniska sektionen, Institutionen för teknikvetenskaper, Tillämpad mekanik, Byggteknik.
    Kommunikation och avtalsadministration: För ökad förståelse mellan parter vid använding av AB 04 och ABT 062015Självständigt arbete på grundnivå (yrkesexamen), 10 poäng / 15 hpStudentuppsats (Examensarbete)
    Abstract [sv]

    Byggbranschen utvecklas ständigt med nya produkter och byggtekniska lösningar vilket gör att uppförandet och förhållningssättet ändras med tiden. Branschorganisationen har gemensamt framtagit föreskrifter som benämns standardavtalen eller Allmänna bestämmelser som innefattar tio kapitel. I standardavtalen förklaras vad parterna ska förhålla sig till exempelvis vad gäller utförandet och vilket ansvar de har rent juridiskt. Det här för att undvika att parter hamnar i tvist med varandra. Man kan se standardavtalen som spelregler för byggbranschen som då vet vad man ska förhålla sig till.

    Då standardavtalen har förhandlats fram mellan de olika parterna i branschen innehåller de en del paragrafer som har tagits fram genom kompromisser och det är främst här missförstånd, oliktolkningar och konflikter uppstår.

    Den här rapporten undersöker vilka frågor som leder till att tvister vanligast uppkommer, i viss mån vad konsekvenserna blir och vidare undersöks hur synen på standardavtalen överlag ser ut i branschen. Rapporten leder fram till förslag hur standardavtalen överlag kan förbättras.

    Arbetet baseras på elva grundfrågeställningar kring den allmänna uppfattningen av standardavtalen samt ett antal frågor rörande bestämmelser i de sex första kapitlen i standardavtalen. Dessa har tagits fram för att klargöra vart tvister och missförstånd kan tänkas uppkomma. De resterande fyra kapitlen har medvetet uteslutits för att begränsa omfattningen i den här rapporten. Innehållet i rapporten grundar sig främst i ett tjugotal intervjuer som har genomförts med entreprenörer och beställare.

    Undersökningen visar att synen på standardavtalen är positiv och fungerar som ett bra verktyg för att veta vad man ska förhålla sig till. Standardavtalen bör dock anpassas till dagens tekniska samhälle. Det redovisas även förslag på metoder och råd som kan användas för att underlätta kommunikationen mellan parterna.

    Detta examensarbete inom högskoleingenjörsprogrammet i byggteknik på Uppsala universitet har utförts under tio veckor åt fastighetsbolaget Klövern i Kista.

  • 54.
    Fors, Sofia
    Uppsala universitet, Teknisk-naturvetenskapliga vetenskapsområdet, Tekniska sektionen, Institutionen för teknikvetenskaper, Tillämpad mekanik, Byggteknik. Kungliga tekniska högskolan.
    Miljöförbättrande åtgärder inom asfaltproduktion: En sammanställning av asfaltbranschens aktuella tekniker2019Självständigt arbete på grundnivå (yrkesexamen), 10 poäng / 15 hpStudentuppsats (Examensarbete)
    Abstract [en]

    This report deals with environmental improvement measures in asphalt production

    and examines the willingness to invest in environmentally friendly technologies. The

    main reasons of this paper are that the asphalt industry have a large impact on the

    environment and the transition to green technologies is slow, and to clarify the

    opportunities around environmentally friendly asphalt production.

    The main purpose of this report is to compile relevant knowledge in the

    improvement of the environmental measures of the asphalt production and thus

    contribute to a faster reduction of carbon dioxide emissions. The questions covered

    are:

    • How has the asphalt been used over time and until?

    • How does the asphalt industry effect the environment?

    • What are the technical solutions?

    • What are the costs of the different technical solutions?

    • What is the trend for more environmentally friendly asphalt production?

    The thesis was concluded through literature studies, consultations with people in the

    asphalt industry and trough several interviews.

    The results of the report show that there are many different measures to reduce the

    environmental impacts from asphalt production, and the main challenge for producers

    is to choose which method is most suitable for their company.

    The interviews report that the willingness to invest in environmentally improving

    techniques exists and that the trend to produce more environmentally friendly will

    increase. Increased requirements and a greater demand for environmentally friendly

    asphalt production from customers are desired.

  • 55.
    Friberg, Johan
    Uppsala universitet, Teknisk-naturvetenskapliga vetenskapsområdet, Tekniska sektionen, Institutionen för teknikvetenskaper, Tillämpad mekanik, Byggteknik.
    Framtagning av typgodkända formkonstruktioner: Med inriktning mot traditionell väggform2013Självständigt arbete på grundnivå (yrkesexamen), 10 poäng / 15 hpStudentuppsats (Examensarbete)
    Abstract [en]

    This diploma work was conducted in collaboration with the Swedish civil engineering

    construction company Skanska Construction in Stockholm. Their interest is to

    develop a number of type approved form constructions which can be used during the

    construction of concrete walls. Skanska focuses on improving safety on their projects

    and both supervisors and workers have a need for approved form constructions in

    the current situation.

    The study is focused on safety and the purpose is to facilitate the preparation before

    the form work can begin. By studying the literature of the subject and conduct

    interviews with employees at Skanska Construction, the understanding of the issue

    and knowledge will be increased.

    Literature studies, interviews together with production and design have been the

    basis for a successful study. The work has resulted in three types of approved form

    constructions to Skanska Construction and the drawings can be used of employees at

    the company. The form constructions are, by using a CAD-program, presented on

    drawings in a clear and convenient way.

  • 56.
    Fryksten, Jonas
    Uppsala universitet, Teknisk-naturvetenskapliga vetenskapsområdet, Tekniska sektionen, Institutionen för teknikvetenskaper, Tillämpad mekanik, Byggteknik.
    Geotekniska sättningsberäkningar på lera: Jämförelse av modeller i datorprogram2016Självständigt arbete på grundnivå (högskoleexamen), 180 hpStudentuppsats (Examensarbete)
    Abstract [en]

    Geotechnical design is important to ensure good stability and bearing capacity of the

    ground. A part of this is to make good forecasts of future settlements. Nowadays

    most calculations are made in computer programs, such as Novapoint Geosuite

    Settlement. Geosuite Settlement includes a variety of calculation models, where some

    of the models include an addition of creep behaviour.

    The main purpose of this diploma work is to compare the results from different

    geotechnical settlement calculation models in Geosuite Settlement. As a reference

    object, an undrained test bank on clay in Lilla Mellösa outside of the community

    Upplands Väsby was selected. On this test site, the Swedish Geotechnical Institute

    (SGI) has performed measurements of long-term settlements since 1947.

    The result of this diploma work shows that the calculation models containing creep

    give result more like the measured settlements, than the calculation models that do

    not include creep. Despite of this, the measured settlement is greater than the

    settlement in calculation models containing creep.

    The most remarkable in this work are high excess pore pressures when using models

    containing creep. These excess pore pressure, in the result of this work, also

    decreases very slowly in time.

    One conclusion of this diploma work, based on the obtained results of this study, in

    comparison with other studies, is to use a calculation model containing creep, if the

    conditions are similar to those at the test site Lilla Mellösa.

  • 57.
    Garcia-Urquia, Elias
    Uppsala universitet, Teknisk-naturvetenskapliga vetenskapsområdet, Tekniska sektionen, Institutionen för teknikvetenskaper, Tillämpad mekanik, Byggteknik. National Autonomous University of Honduras.
    Establishing Rainfall Frequency Contour Lines as thresholds for rainfall-induced landslides in Tegucigalpa, HondurasIngår i: Natural Hazards, ISSN 0921-030X, E-ISSN 1573-0840Artikel i tidskrift (Refereegranskat)
  • 58.
    Garcia-Urquia, Elias
    Uppsala universitet, Teknisk-naturvetenskapliga vetenskapsområdet, Tekniska sektionen, Institutionen för teknikvetenskaper, Tillämpad mekanik, Byggteknik. National Autonomous University of Honduras.
    Rainfall-induced Landslide Database for Tegucigalpa, Honduras, 1980-20052015Rapport (Övrigt vetenskapligt)
  • 59.
    Garcia-Urquia, Elias
    Uppsala universitet, Teknisk-naturvetenskapliga vetenskapsområdet, Tekniska sektionen, Institutionen för teknikvetenskaper, Tillämpad mekanik, Byggteknik. National Autonomous University of Honduras.
    The Use of Press Archives in the Temporal and Spatial Analysis of Rainfall-Induced Landslides in Tegucigalpa, Honduras, 1980-20052015Doktorsavhandling, sammanläggning (Övrigt vetenskapligt)
    Abstract [en]

    The scarcity of data poses a challenging obstacle for the study of natural disasters, especially in developing countries where the social vulnerability plays as important a role as the physical vulnerability.  The work presented in this thesis is oriented towards the demonstration of the usefulness of press archives as a data source for the temporal and spatial analysis of landslides in Tegucigalpa, Honduras for the period between 1980 and 2005.  In the last four decades, Tegucigalpa has been characterized by a disorganized urban growth that has significantly contributed to the destabilization of the city’s slopes.  In the first part of the thesis, a description of the database compilation procedure is provided.  The limitations of using data derived from press archives have also been addressed to indicate how these affect the subsequent landslide analyses.  In the second part, the temporal richness offered by press archives has allowed the establishment of rainfall thresholds for landslide occurrence.  Through the use of the critical rainfall intensity method, the analysis of rainfall thresholds for 7, 15, 30 and 60 antecedent days shows that the number of yielded false alarms increases with the threshold duration.  A new method based on the rainfall frequency contour lines was proposed to improve the distinction between days with and without landslides.  This method also offers the possibility to identify the landslides that may only occur with a major contribution of anthropogenic disturbances as well as those landslides induced by high-magnitude rainfall events.  In the third part, the matrix method has been employed to construct two landslide susceptibility maps: one based on the multi-temporal press-based landslide inventory and a second one based on the landslide inventory derived from an aerial photograph interpretation carried out in 2014.  Despite the low spatial accuracy provided by the press archives in locating the landslides, both maps exhibit 69% of consistency in the susceptibility classes and a good agreement in the areas with the highest propensity to landslides.  Finally, the integration of these studies with major actions required to improve the process of landslide data collection is proposed to prepare Tegucigalpa for future landslides.  

    Delarbeten
    1. The use of press data in the development of a database for rainfall-induced landslides in Tegucigalpa, Honduras, 1980–2005
    Öppna denna publikation i ny flik eller fönster >>The use of press data in the development of a database for rainfall-induced landslides in Tegucigalpa, Honduras, 1980–2005
    2014 (Engelska)Ingår i: Natural Hazards, ISSN 0921-030X, E-ISSN 1573-0840, Vol. 73, nr 2, s. 237-258Artikel i tidskrift (Refereegranskat) Published
    Abstract [en]

    The capital city of Honduras, Tegucigalpa, suffers from the occurrence of destructive landslides on a yearly basis. During the rainy season, damages to infrastructure as well as injuries, casualties and homeless individuals resulting from landslides are reported in the press. This paper presents the development of a database for rainfall-induced landslides for the period 1980–2005, based on the news reported by two local newspapers. The editions comprehended during the study period have been scrutinized, and articles focusing on landslides, tropical storms, hurricanes, floods and vulnerability of the city have been collected. The interpretation of these archives has allowed the compilation of valuable data of approximately 400 landslides. The analyses of monthly and annual precipitation during the study period show how extreme rainfall events like Hurricane Mitch in October of 1998 have significantly contributed to the initiation of landslides. In addition, the assessment of the slums and neighborhoods affected by landslides during the study period reveals an evident link between the social and physical vulnerability of Tegucigalpa. In order to estimate the reliability of this press-based database, the set of landslides that have been reported as a result of Hurricane Mitch in the press archives has been compared with two inventories based on the interpretation of aerial photographs taken in 1999 and 2001. It is shown that the analysis of the landslide damage left after the hurricane can be enriched with the detailed temporal data provided in the archives and the precise location of these events determined by the aerial photographs. Despite the difficulties faced in the compilation of this database, a good comprehension of the temporal and spatial distribution of landslides in Tegucigalpa has been achieved.

    Nationell ämneskategori
    Geoteknik
    Forskningsämne
    Teknisk fysik med inriktning mot tillämpad mekanik
    Identifikatorer
    urn:nbn:se:uu:diva-222910 (URN)10.1007/s11069-014-1043-5 (DOI)000340490100006 ()
    Forskningsfinansiär
    Sida - Styrelsen för internationellt utvecklingssamarbete, 54100006
    Tillgänglig från: 2014-04-15 Skapad: 2014-04-15 Senast uppdaterad: 2017-12-05
    2. Rainfall thresholds for the occurrence of urban landslides in Tegucigalpa, Honduras: An application of the critical rainfall intensity
    Öppna denna publikation i ny flik eller fönster >>Rainfall thresholds for the occurrence of urban landslides in Tegucigalpa, Honduras: An application of the critical rainfall intensity
    2015 (Engelska)Ingår i: Geografiska Annaler. Series A, Physical Geography, ISSN 0435-3676, E-ISSN 1468-0459, Vol. 97, nr 1, s. 61-83Artikel i tidskrift (Refereegranskat) Published
    Nationell ämneskategori
    Samhällsbyggnadsteknik
    Forskningsämne
    Teknisk fysik med inriktning mot tillämpad mekanik
    Identifikatorer
    urn:nbn:se:uu:diva-243003 (URN)10.1111/geoa.12092 (DOI)000350500400005 ()
    Forskningsfinansiär
    Sida - Styrelsen för internationellt utvecklingssamarbete, 54100006
    Tillgänglig från: 2015-02-03 Skapad: 2015-02-03 Senast uppdaterad: 2017-12-05
    3. Establishing Rainfall Frequency Contour Lines as thresholds for rainfall-induced landslides in Tegucigalpa, Honduras
    Öppna denna publikation i ny flik eller fönster >>Establishing Rainfall Frequency Contour Lines as thresholds for rainfall-induced landslides in Tegucigalpa, Honduras
    (Engelska)Ingår i: Natural Hazards, ISSN 0921-030X, E-ISSN 1573-0840Artikel i tidskrift (Refereegranskat) Submitted
    Nyckelord
    rainfall threshold, triggering rainfall, antecedent rainfall, urban landslides, rainfall frequency contour lines, Tegucigalpa
    Nationell ämneskategori
    Annan geovetenskap och miljövetenskap
    Forskningsämne
    Geovetenskap med inriktning mot miljöanalys
    Identifikatorer
    urn:nbn:se:uu:diva-264502 (URN)
    Forskningsfinansiär
    Sida - Styrelsen för internationellt utvecklingssamarbete, 54100006
    Tillgänglig från: 2015-10-13 Skapad: 2015-10-13 Senast uppdaterad: 2017-12-01
    4. Comparison of landslide susceptibility maps derived from press-based and aerial photograph interpretation inventories for Tegucigalpa, Honduras
    Öppna denna publikation i ny flik eller fönster >>Comparison of landslide susceptibility maps derived from press-based and aerial photograph interpretation inventories for Tegucigalpa, Honduras
    (Engelska)Manuskript (preprint) (Övrigt vetenskapligt)
    Nyckelord
    landslide susceptibility index, matrix method, press archives, Tegucigalpa, urban landslides
    Nationell ämneskategori
    Annan geovetenskap och miljövetenskap
    Forskningsämne
    Geovetenskap med inriktning mot miljöanalys
    Identifikatorer
    urn:nbn:se:uu:diva-264500 (URN)
    Forskningsfinansiär
    Sida - Styrelsen för internationellt utvecklingssamarbete, 54100006
    Tillgänglig från: 2015-10-13 Skapad: 2015-10-13 Senast uppdaterad: 2015-11-13
  • 60.
    Garcia-Urquia, Elias
    et al.
    Uppsala universitet, Teknisk-naturvetenskapliga vetenskapsområdet, Tekniska sektionen, Institutionen för teknikvetenskaper, Tillämpad mekanik, Byggteknik. National Autonomous University of Honduras.
    Yamagishi, Hiromitsu
    Asian Insitute of Space Information.
    Comparison of landslide susceptibility maps derived from press-based and aerial photograph interpretation inventories for Tegucigalpa, HondurasManuskript (preprint) (Övrigt vetenskapligt)
  • 61.
    Garney, Klas
    et al.
    Uppsala universitet, Teknisk-naturvetenskapliga vetenskapsområdet, Tekniska sektionen, Institutionen för teknikvetenskaper, Tillämpad mekanik, Byggteknik.
    Alving, Lovisa
    Uppsala universitet, Teknisk-naturvetenskapliga vetenskapsområdet, Tekniska sektionen, Institutionen för teknikvetenskaper, Tillämpad mekanik, Byggteknik.
    Kvalitetssäkring med digitala hjälpmedel: En studie om BIM 360 Field2017Självständigt arbete på grundnivå (yrkesexamen), 10 poäng / 15 hpStudentuppsats (Examensarbete)
    Abstract [en]

    For a long time, the construction industry has lagged behind in the field of digitalization. It is about time for the industry to find new tools to be able to deliver a higher standard of quality assurance. This report is concerned with the application BIM 360 Field, which is a cloud based IT-tool and can be used by anyone on the construction site. The application has multiple areas of usage, including deviation handling, self-monitoring, QR-code, inspection and completion plans.The purpose of the study is to examine how effective BIM 360 Field is compared to the industry’s traditional way of handling deviations. This degree project is written in cooperation with Skanska Sverige AB and the project “J-huset” in Uppsala. The purpose is further to examine if BIM 360 Field can be applied and used for the inspection of “J-huset”.The study has been carried out through interviews with the production management on various projects. Interviews, as well as an introduction to the application, have been carried out with proficient staff from Skanska. A field study has been undertaken on the “J-huset” in Uppsala for the purpose of gaining a personal opinion as well as knowledge of the application.The result gained from the study is that BIM 360 Field has great potential for saving time during the construction process. From the interviews with production management, who used BIM 360 Field during production, some issues have been identified with the application.The conclusion in this study is that the BIM 360 Field is applicable to the “J-Huset” in Uppsala. The program is user friendly and has great potential to streamline work on quality assurance in production. In order to achieve a successful result, it is recommended to use the program at an early stage and throughout the production

  • 62.
    Gille, Ambjörn
    Uppsala universitet, Teknisk-naturvetenskapliga vetenskapsområdet, Tekniska sektionen, Institutionen för teknikvetenskaper, Tillämpad mekanik, Byggteknik.
    Arbetsmiljöutredning av fallskydd på byggarbetsplatser2013Självständigt arbete på grundnivå (yrkesexamen), 10 poäng / 15 hpStudentuppsats (Examensarbete)
    Abstract [en]

    Fall accidents are a big problem in the construction industry today and stand forapproximately 23% of all accidents. Skanska is a construction company that has avision toachieve zero accidents. Eliminating fall accidents is one step on the way towards theirvision. The state of Skanskas fall safety has been analyzed in this thesis to show whichimprovements are possible in fall safety.A literature study has been performed in which Arbetsmiljöverkets (The Swedishwork environment authority’s) laws and rules, together with Skanskas own rules havebeen studied. The conclusion of the literature study is that Skanskas own rules wouldbe sufficient to meet the goal. If those rules were followed then all the lawrequirements would be fulfilled with good margin, and good fall safety would beachieved.Construction site visits have been made, participation to safety rounds undertaken,and safety round protocols collected in order to analyze the state of Skanskas siteswhen it comes to fall safety. The results showed that Skanskas construction siteskeep a very high standard when it comes to fall safety, but there are improvementsthat could be made regarding the general order on the sites, and also by properlymarking the covering of holes.Interviews with site managers, production leaders, safety representatives, Skanskasconstruction workers, subcontractor supervisors, a health and safety engineer and ahealth and safety manager from Skanska England were undertaken in order to get anidea about what flaws might exist today within fall safety, and what can be done toimprove the fall safety.The results from these interviews showed that improvements on how people usepersonal fall safety equipment must be done, and that the major cause that so manyfall accidents occur is a lack in safety behavior by the construction workers. Increasedsafety awareness and changes in personal behavior are required to reach the vision ofzero workplace accidents.

  • 63.
    Gille, Ragnar
    et al.
    Uppsala universitet, Teknisk-naturvetenskapliga vetenskapsområdet, Tekniska sektionen, Institutionen för teknikvetenskaper, Tillämpad mekanik, Byggteknik.
    Jämthagen, André
    Uppsala universitet, Teknisk-naturvetenskapliga vetenskapsområdet, Tekniska sektionen, Institutionen för teknikvetenskaper, Tillämpad mekanik, Byggteknik.
    Studie i hållbart byggande: En metodprövning med jämförelse av fasadsystem2017Självständigt arbete på grundnivå (yrkesexamen), 10 poäng / 15 hpStudentuppsats (Examensarbete)
    Abstract [en]

    This report is written for the construction company NCC and Uppsala University, with the goal to investigate if there is a simple method to compare building materials from the perspective of sustainability, to help the decision-making when choosing materials for building Projects.

    To test the method four facade systems (brick, ventilated plaster, unventilated plaster and cement board) have been analyzed with different tools used for sustainable assessement, namely: Life-cycle cost analysis, Life-cycle analysis and assessment criteria. To make a final assessment of the four facade systems and combine the results of the above mentioned tools, a multiple-criteria decision analysis was used. The result from the final assessment show that unventilated plaster facade is the most sustainable option, when analyzed from an assumed lifespan of 50 years. The results, however, are seen as questionable due to the fact that the criteriums and their weight to the final results are based on this report's author's estimation and may not represent an objective truth. Due to the lack of available data, many assumptions were required when utilizing the tools, which further diminished the credibility of the results. The conclusion is that there is no simple method to compare the sustainability of building materials that captures the entire spectrum of what sustainability consists of. Instead of trying to find a new method, the already established enviromental certificates should be used and further developed.

  • 64.
    Goczkowski, Adam
    Uppsala universitet, Teknisk-naturvetenskapliga vetenskapsområdet, Tekniska sektionen, Institutionen för teknikvetenskaper, Tillämpad mekanik, Byggteknik.
    Viktiga aspekter i samverkansformen NCC Projektstudio: En intervjustudie för NCC2013Självständigt arbete på grundnivå (yrkesexamen), 10 poäng / 15 hpStudentuppsats (Examensarbete)
    Abstract [en]

    The projecting time in the construction industry needs to become more efficient to

    shorten the amount of time it takes to project a build. One of the North's leading

    construction company NCC constuction Sweden AB has developed a form of

    collaboration called ”NCC project studio” that they use in some projects today.

    My thesis consists in bringing forth the most important aspects of the collaboration

    form called NCC project studio. The point of this is to use my thesis to help the

    company develop a quality document that can assist them when starting collaboration

    based on NCC project studio in the future.

    The conclusion of my thesis was that much of the focus needs to be on explaining to

    the participants what NCC is aiming to gain from working with the NCC project

    studio and also which important parts that needs to be worked on.

  • 65.
    Grahn Westin, Emil
    Uppsala universitet, Teknisk-naturvetenskapliga vetenskapsområdet, Tekniska sektionen, Institutionen för teknikvetenskaper, Tillämpad mekanik, Byggteknik.
    VIBRATIONSSKADOR - FÖREKOMST OCH FÖREBYGGANDE: Analys av ett strukturerat arbetssätt inom bostadsproduktion2014Självständigt arbete på grundnivå (yrkesexamen), 10 poäng / 15 hpStudentuppsats (Examensarbete)
    Abstract [en]

    Ask any constructional worker and there is a high probability that this person knows a colleague with pain or other disorders caused by working with power tools.

    According to the Swedish Work Environment Authority 71 percent of the Swedish constructional workers is exposed to vibrations at least 25 percent of the working hours. Despite this, the number of reported occupational sicknesses caused by vibrations is as low as 1, 4 percent.

    JM Ltd. is one of the largest constructional companies in Sweden. Their main business is new housing and development of residential areas. God quality and low impact on the environment is a part of great importance in the company’s long-term goals. To achieve this, and to ensure an effective production, the activities have gradually been organized according to Lean production. In the year of 2010 the producing part of the company began to use methods originating from Lean such as process orientation and standardization of work procedures. JM calls this Structured production.

    The purpose of this thesis is to investigate how working according to Lean when producing apartment buildings interacts with a safe working environment. The goal is to investigate and identify problematic operations during the assembly of semi-prefabricated, non-bearing walls so-called perimeter walls.

    The method used is a time study conducted in spring of 2014 on construction sites in Stockholm. The exposure to vibrations from power tools on construction workers, when working according to the installation instructions applicable at JM’s building projects was examined.

    The study revealed that the action value determined by the Swedish Work Environment Authority was exceeded when installing perimeter walls according to the installation instructions.

    The conclusion is to extend measurements and medical surveillance of exposed operations and personnel. A package of equipment and materials to be used when installing perimeter walls is presented along with possible methodological improvements of the installation instructions.

  • 66.
    Green Pettersson, Karoline
    Uppsala universitet, Teknisk-naturvetenskapliga vetenskapsområdet, Tekniska sektionen, Institutionen för teknikvetenskaper, Tillämpad mekanik, Byggteknik.
    Ytmodellering i Civil 3D: Interoperabilitet och begränsningar2016Självständigt arbete på grundnivå (högskoleexamen), 10 poäng / 15 hpStudentuppsats (Examensarbete)
    Abstract [en]

    In order to create a complete BIM-model of a whole project, it is common thatseveral programs and software-suites are used. It is beneficial if the models producedin these programs are compatible with each other, in order to improve theeffectiveness of the construction process as a whole. If a model created in oneprogram has to be altered in order to be compatible with another the result is excesswork.Designers, utilizing Civil 3D, more often than not have to alter constructions whichare to be part of a surface-model. This creates a situation where the construction hasto be modelled twice as Civil 3D cannot use the original model. The purpose of thisessay is to research the problems pertaining to surface creation in Civil 3D and theconsequences they have for designers.To better understand the process of surface creation of an object containing verticalparts a practical study of the subject has been carried out in Civil 3D. A simpleconstruction was created in Revit and imported to Civil 3D as to create a surface ofthe highest parts of the construction.The methods used by designers working in Civil 3D were researched as a qualitativestudy by means of surveys and interviews. The result of the study makes it clear thatthe respondents are dependent on models from different fields involved in the sameproject. As the models do not automatically adapt to the software used by thedesigners in question a considerable amount of manual reconstruction of models areneeded. Fundamentally, the issue is two-fold. Firstly, designers depend upon 3Dmodels and objects created by others. Secondly, Civil 3D cannot render verticalsurfaces or overhangs while creating surfaces. Knowledge about the way Civil 3Dworks and utilizing methods avoiding future problems before they occur has thepotential to improve workflow. Sufficient communication between parties involvedalso results in a more effective process.

  • 67.
    Gunnesson, Matilda
    et al.
    Uppsala universitet, Teknisk-naturvetenskapliga vetenskapsområdet, Tekniska sektionen, Institutionen för teknikvetenskaper, Tillämpad mekanik, Byggteknik. 1996.
    Åkelid, Elin
    Uppsala universitet, Teknisk-naturvetenskapliga vetenskapsområdet, Tekniska sektionen, Institutionen för teknikvetenskaper, Tillämpad mekanik, Byggteknik.
    Framtidens byggproduktion: deponifri: En kartläggning av framgångsfaktorer för minskat byggavfall till deponi inom nyproduktion2019Självständigt arbete på grundnivå (yrkesexamen), 10 poäng / 15 hpStudentuppsats (Examensarbete)
    Abstract [en]

    This technical report contains a study of the construction industries work regarding landfill waste. More specifically Sweden’s and the company Skanska’s development to prevent landfill and fulfill an ecofriendly society. The construction companies in Sweden are accountable for over a third of the country’s total waste and are prioritized to improve their statistics. Skanska have a goal to reach zero percent landfill waste, therefor should all the construction material be able to reuse or recycle.

    The purpose of this study is to find the causes and background of the landfill waste and to identify the factors of success. The goal is to give recommendations to Skanska on how they progressively can phase out landfill waste.

    The content of the report is built from a background part where the general challenge and goals is explained. Thereafter are the methods for information acquisition, interview study and literature study explained along with some typical landfill material and how it can be reused or recycled. A few projects are listed under chapter four to give the reader an understanding for what the authors have been looking at. Lastly the report will take the reader through the study’s results, discussion and recommendations.

    The results show that some recycling methods are available for the fractions which usually ends up as landfill. But the requirements for recycling and reuse are often too hard to fulfill in the construction industries. The interviews show that a high commitment is necessary for a highly qualified work with the landfill waste.

    Future projects are recommended to early on identify material that easily becomes landfill and avoid them as much as possible. Use smaller bins where there is less space and work continently with waste plans.

  • 68.
    Gustafsson, Sofia
    et al.
    Uppsala universitet, Teknisk-naturvetenskapliga vetenskapsområdet, Tekniska sektionen, Institutionen för teknikvetenskaper, Tillämpad mekanik, Byggteknik.
    Ferner, Johannes
    Uppsala universitet, Teknisk-naturvetenskapliga vetenskapsområdet, Tekniska sektionen, Institutionen för teknikvetenskaper, Tillämpad mekanik, Byggteknik.
    Spänningsfördelning i enskild bärverksdel: En jämförelse mellan handberäkningar och FEM-design 3D Structure 162017Självständigt arbete på grundnivå (yrkesexamen), 10 poäng / 15 hpStudentuppsats (Examensarbete)
    Abstract [en]

    As cities are densified and as the housing shortage iscontinuously high, the need to utilize height in new constructionsincreases, and with it, also the need to quickly make preliminaryassessments when designing structural components in higherbuildings. The question of whether calculations made using handmethods and calculations made using computerized methods yieldsresults of the same order of magnitude, when analyzing structures,is therefore of interest.

    The question investigated in this work is whether calculationsmade by hand and calculations made with FEM-design 3D Structure,with respect to stresses in a single structural component, yieldresults of the same order of magnitude. A 16 storey building withconcrete walls and floors was the basis for the calculations. Thecalculations were made for two load cases for both handcalculations and calculations made with FEM-design 3D Structure;one case where vertical forces are considered to have a beneficialeffect on the stability of the building and one case wherevertical forces are considered to have an adverse effect on thestability of the building.

    The survey shows that there are major differences in resultsbetween the two methods for each load case respectively. Theexplanation for this is believed to depend upon thecharacteristics of the two calculation methods.

    The recommendation given in this essay is that hand calculationsshould be used when the accuracy is of less important for theapplication of the results, when there is no access tocomputerized calculation programs, or when the time required tomake more accurate calculations is limited. FEM design 3DStructure 16 should be used when accuracy is of greater importanceand complexity is high.

    The work was carried out in collaboration with Knut JönsonIngenjörsbyrå i Uppsala AB.

  • 69.
    Gälman, Christoffer
    et al.
    Uppsala universitet, Teknisk-naturvetenskapliga vetenskapsområdet, Tekniska sektionen, Institutionen för teknikvetenskaper, Tillämpad mekanik, Byggteknik.
    Ekelöw, Tobias
    Uppsala universitet, Teknisk-naturvetenskapliga vetenskapsområdet, Tekniska sektionen, Institutionen för teknikvetenskaper, Tillämpad mekanik, Byggteknik.
    Bygg gärna, men inte här!: Ledtider och kostnader i Detaljplaneprocessen2016Självständigt arbete på grundnivå (yrkesexamen), 10 poäng / 15 hpStudentuppsats (Examensarbete)
    Abstract [sv]

    Detta examensarbete undersöker detaljplaneprocessen utifrån ett tids- och kostnadsperspektiv och belyser även processens brister. Detaljplaneprocessen får idag mycket kritik från olika håll och målas upp som en bromskloss i produktionen av nya bostäder i Sverige.

    Vissa kommuners hanteringstid för detaljplaneprocessen i Stockholms län visade på att den genomsnittliga processen tar mellan 30-60 månader. Överklagas en detaljplan förlängs processen vanligtvis med 4 till 12 månader. I Stockholms län överklagas en fjärdedel av alla detaljplaner, men endast 1,3 % av dessa leder till att detaljplanen upphävs. Utöver det låga antalet som vinner bifall, ifrågasätter siffrorna också i viss mån demokratin i dagens samhälle, hur många av medborgarnas klagomål får bifall, jämtemot hur antalet av myndigheter, såsom Länsstyrelsens klagomål.

    För att få ett grepp om byggherrens kostnad undersöktes ett par flerbostadsprojekt i Stockholms kommun, med ett par i Solna. Undersökningen visade på att kostnaden kan skilja allt mellan 650 000 upp till 6 500 000 SEK. Kostnaden för detaljplaneprocessen visar sig ha stark korrelation med tiden.

    Rekommendationerna från vårt håll landar i att ett ökat informationsutbyte mellan alla parter, inklusive sakägare, gagnar processen som helhet. Färre klagomål från allmänheten leder till en smidigare process för både byggherrar och kommunen, samtidigt som ett ökat samarbete också bidrar.

  • 70.
    Hahne, Johannes
    et al.
    Uppsala universitet, Teknisk-naturvetenskapliga vetenskapsområdet, Tekniska sektionen, Institutionen för teknikvetenskaper, Tillämpad mekanik, Byggteknik.
    Karlsson, Linnea
    Uppsala universitet, Teknisk-naturvetenskapliga vetenskapsområdet, Tekniska sektionen, Institutionen för teknikvetenskaper, Tillämpad mekanik, Byggteknik.
    Vägen mot en integration av BIM och Internet of Things: En modell över fördelar och förutsättningar vid användning av Internet of Things i BIM2018Självständigt arbete på grundnivå (yrkesexamen), 10 poäng / 15 hpStudentuppsats (Examensarbete)
    Abstract [en]

    This thesis considers the integration of BIM and IoT in the building process of offices. The thesis is hopefully going to create knowledge about BIM and IoT and describe what needs to be done to carry out an integration.The planning of offices today consists of the use of BIM and a lot of smart solutions. But what are the benefits from an integration of BIM and Internet of Things and how can this be used throughout the building process? New and smart solutions are invented all the time and although not all are possible to use in everyday offices, some can already be of great use. For the future there is a great need for smart and sustainable solutions that helps to conserve energy but at the same time are economically sustainable. This needs to become a part of our everyday to help conquer one of our times biggest challenges, the environmental issue.

    This thesis highlights the advantages, disadvantages and requirements of an integration of BIM and IoT. It concerns the technology behind IoT and what the future has to offer.The result of the written thesis is a model that describes how an integration of BIM and IoT can be carried out during the different stages of the building process. The model is going to work like a cycle where information from sensors constantly flows to the BIM model during the entire building process. Information and experiences gained from the different stages of the building process can be used

    to evaluate the construction and its different systems and the experience gained is used in the next project.An integration will be hard to do on a big scale due to different factors. The technology is here but the pathway and standards for it are not.

  • 71.
    Hansson, Fanny
    et al.
    Uppsala universitet, Teknisk-naturvetenskapliga vetenskapsområdet, Tekniska sektionen, Institutionen för teknikvetenskaper, Tillämpad mekanik, Byggteknik.
    Hellholm, Matilda
    Uppsala universitet, Teknisk-naturvetenskapliga vetenskapsområdet, Tekniska sektionen, Institutionen för teknikvetenskaper, Tillämpad mekanik, Byggteknik.
    Utbildning och kravställning i Norra Djurgårdsstaden: Ett hjälpmedel för hållbart byggande2017Självständigt arbete på grundnivå (yrkesexamen), 10 poäng / 15 hpStudentuppsats (Examensarbete)
    Abstract [en]

    Stockholm Royal Seaport is one of Europe´s largest urban development projects. The city of Stockholm has ambitious environmental goals and a vision for Stockholm Royal Seaport to develop into a world-class environmental urban district. In order to achieve the aspiring goals, requirements are set in the agreement with property developers with land allocation. The city of Stockholm offers a capacity development programme to assure fulfilling of the requirements and simultaneously educate the property developers.

    The aim of this thesis is to examine how the requirements and capacity development programme in Norra 2, the third leg in the development of Stockholm Royal Seaport, has contributed to spreading knowledge among property developers. The thesis is limited to investigation energy requirements. With focus on the technical solutions used to obtain a low energy usage and what the developers will carry on to future projects.

    The analysis indicates that the capacity development programme has a positive effect on the developers´s collaboration to achieve more sustainable buildings. Strict verifying of the requirements has been a contributing factor to the positive results in Stockholm Royal Seaport. Several technical solutions are incorporated in the buildings in order to meet the requirements of energy savings. This leads to advanced systems that are difficult to manage and has beeenan issue fort the developers. Another issue is ambiguous and contradictory requirements that according to the developers has taken a consideralble amount of time and resources to fulfil. Setting requirements is important in developing more sustainable buildings. If demans are not made a lot of companies will chose the cheap and simple way to maximize profits. Continuing setting requirements and having a dialouge between stakeholders in an eraly stage is essential for a continuing sustainable development.  

  • 72.
    Haukka, Astrid
    et al.
    Uppsala universitet, Teknisk-naturvetenskapliga vetenskapsområdet, Tekniska sektionen, Institutionen för teknikvetenskaper, Tillämpad mekanik, Byggteknik.
    Larsson, Linda
    Uppsala universitet, Teknisk-naturvetenskapliga vetenskapsområdet, Tekniska sektionen, Institutionen för teknikvetenskaper, Tillämpad mekanik, Byggteknik.
    Fasövergångsmaterial för ökad inomhuskomfort: Reducering av temperaturvariationer och kylbehov med hjälp av fasövergångsmaterial2019Självständigt arbete på avancerad nivå (yrkesexamen), 20 poäng / 30 hpStudentuppsats (Examensarbete)
    Abstract [en]

    This report aims to study how the indoor climate in a conference room can be improved by the use of phase change material (PCM). The study includes an experiment where 40 kg of salt hydrate based PCM was placed within a conference room located in an office in the city of Uppsala, Sweden. The experiment resulted in a decrease in the peak temperature with respect to the internal heat gains in the conference room and a slower temperature increase with PCM implemented. The report concludes that PCM can improve the indoor climate in regard to its ability to limit the temperature fluctuation.

    The study also contains modelling and simulation over the office and conference room in the program Trnsys. This was carried out to study how the temperature and cooling demand in the conference room and office respectively would change with a larger implementation of PCM. When 106 kg of PCM was simulated to be implemented in two of the conference room walls, the specific peak temperature was on average decreased with 0.17 °C/kW during the year. Furthermore, a decrease in the cooling demand with 16 % was achieved when implementing 1 208 kg of PCM in the internal walls of the office. This study shows that there is potential for reducing the cooling demand in the building through an implementation of PCM. Further studies with a more detailed model of the office is recommended before deciding upon if and where PCM should be implemented.

  • 73.
    Hellberg, Axel
    Uppsala universitet, Teknisk-naturvetenskapliga vetenskapsområdet, Tekniska sektionen, Institutionen för teknikvetenskaper, Tillämpad mekanik, Byggteknik.
    Miljöklassning inom infrastruktur och anläggningsprojekt: - en fördjupning inom CEEQUAL2013Självständigt arbete på grundnivå (yrkesexamen), 10 poäng / 15 hpStudentuppsats (Examensarbete)
    Abstract [en]

    This thesis has evaluated environmental classifications of projects and the lessons learned to explore what the possible ramifications of implementing this in the construction and infrastructure are. Companies today are looking to develop methods to demonstrate their environmental commitments, but there is an uncertainty regarding the contribution of environmental classifications in this aspect.

    The literature review presents the theory of environmental classification, which provides a general knowledge of its function. The empirical data is based on an analysis of existing classification methods and qualitative interviews. The analysis shows specific environmental classification system for the area of construction and infrastructure. CEEQUAL is currently the only environmental classification applicable to Swedish projects and therefore serves as the basis for the continued analysis. The interviews focus on the experience and perceptions of the completed and on-going CEEQUAL project and their benefits.

    The analysis shows that active work on environmental issues relates to different areas and varies between a wide range of different aspects of construction and infrastructure projects. Environmental classification itself focuses on the planning and execution phase of the project and it evaluates the project’s environmental sustainability. By scoring categories of environmental commitments through documents, photos or other documentation, points are summarized to form the basis for a final grade. This final grade provides a certificate and can be used to demonstrate the project's environmental and sustainability level. Assuming that time and finances available, the system provides support for the completion of environmental projects.

    The conclusion shows that the prime attribute of environmental classification is the framework for environmental work it provides within a project. The analysis shows that there is a restriction in the system's current configuration. The original purpose of environmental classification, to promote respect for the environment, has been eclipsed by its strength as a marketing tool. 

  • 74.
    Hellström, Martin
    Uppsala universitet, Teknisk-naturvetenskapliga vetenskapsområdet, Tekniska sektionen, Institutionen för teknikvetenskaper, Tillämpad mekanik, Byggteknik.
    OPTIMERING AV SAMVERKANSBROAR: En jämförande studie av stålbalkars tvärsnitt med avseende på bärighet, ekonomi och miljö.2017Självständigt arbete på grundnivå (yrkesexamen), 10 poäng / 15 hpStudentuppsats (Examensarbete)
    Abstract [sv]

    Den här undersökningen strävar efter att ge en bild av möjligheterna för att minska materialmängden i samverkansbroar med hänsyn till kostnadsbesparing och miljöpåverkan. Kan mindre stål användas i balktvärsnittet med bibehållen kapacitet?

     

    Objektet för undersökningen är en samverkansbro i Gallsbo, Borlänge som projekterats av konsultföretaget Tyréns i Uppsala. Tyréns valde att dimensionera en 1100 mm hög balk som senare kort efter dimensionerades om till 1300 mm, på förfrågan från Trafikverket för att minska materialkostnaden och miljöpåverkan. Men är det den mest optimala balkdimensionen? Går det att optimera balken ännu mera. Det förklarar intresset av att göra balken än högre, vilket även är anledning till det här examensarbetet. Genom att använda företagets beräkningsmetoder har ett nytt tvärsnitt med höjden 1500 mm dimensionerats med tillräcklig bärförmåga.

     

    Resultatet visar att det är möjligt att optimera balken ytterligare och minska mängden stål i balken med tillräcklig bärförmåga i alla dimensioneringsavseenden. I vissa dimensioneringsaspekter ökar bärförmågan samtidigt som den minskar i andra i enlighet med Eurokod. Alla kontroller visar dock att bärförmågan är fullt tillräcklig. Kostnadsbesparingen som uppkommer vid minskat tvärsnitt bör dock jämföras med kostnaden för optimeringsarbetet av balken.

  • 75.
    Hellström, Sebastian
    et al.
    Uppsala universitet, Teknisk-naturvetenskapliga vetenskapsområdet, Tekniska sektionen, Institutionen för teknikvetenskaper, Tillämpad mekanik, Byggteknik.
    Lamti, Emir
    Uppsala universitet, Teknisk-naturvetenskapliga vetenskapsområdet, Tekniska sektionen, Institutionen för teknikvetenskaper, Tillämpad mekanik, Byggteknik.
    Digitaliserade Förvaltningslösningar med BIM: En utvärdering av ett pilotprojekt i samarbete med Tyréns AB2015Självständigt arbete på grundnivå (yrkesexamen), 10 poäng / 15 hpStudentuppsats (Examensarbete)
    Abstract [en]

    Using BIM to streamline performance of duties has great potential. This is being

    realized in an increasing number of companies. In the construction industry the

    concept of BIM is not new, although actually implementing BIM within a facility

    management company has thus far been rare.

    In order to provide guidance and information related to how an implementation of

    BIM could look within an organization, an initiative called "BIM i staten" was launched

    by five government based constructors.

    A pilot project has been initiated by the consulting company Tyréns that deals with an

    implementation of BIM in the facility management operations of their office building in

    Stockholm. On this basis, this following report aims to evaluate this pilot project

    based on the documentation which can be found in “BIM i staten”.

    The goal of this thesis is to show to which extent the system functions of the BIM and

    facility management systems used within the pilot project coincide with the system

    functions described in “BIM i staten”. Furthermore, the goal is to produce

    recommendations for Tyréns’ continued work with regard to adjustments of the

    systems.

    The result shows that the systems in the project coincides with 50% of the features

    that the criteria describe and that further 23% of the features within the project do

    not fully comply with the criteria. The remaining system features are not yet available.

    The recommendations primarily focus on the system called Maint3D and the facility

    management information that is made available.

  • 76.
    Helmerson, Simon
    et al.
    Uppsala universitet, Teknisk-naturvetenskapliga vetenskapsområdet, Tekniska sektionen, Institutionen för teknikvetenskaper, Tillämpad mekanik, Byggteknik.
    Bjurbäck, Oscar
    Uppsala universitet, Teknisk-naturvetenskapliga vetenskapsområdet, Tekniska sektionen, Institutionen för teknikvetenskaper, Tillämpad mekanik, Byggteknik.
    Jämförelse av stenull- och polyuretanisolering: Brand- och fuktegenskaper i passivhuskonstruktion2012Självständigt arbete på grundnivå (yrkesexamen), 10 poäng / 15 hpStudentuppsats (Examensarbete)
    Abstract [en]

    This report compares two different types of insulation with regards to fire and moisture. The materials were tested for the company Fiskarhedenvillan AB, for a wall and a roof construction that the company currently uses in the establishment of Sweden's first certified passive house for international standards.

    Their current material, Rockwool, is compared to a relatively new material on the Swedish market called SEALECTION Agribalance sold by the company ISO Green AB. The material is a type of polyurethane insulation. This insulation material would result in a more efficient execution of the construction as it provides waterproofing and is applied more easily than Rockwool. From a fire standpoint, literature studies and discussions with fire experts led to results. The construction moisture characteristics of the two materials were compared in a simulation program called WUFI 5.1 PRO. Literature were done to understand moisture and understand how to use the simulation program.

    This study provided results about how well suited the materials were for Fiskarhedenvillan AB:s passive house. The main conclusions were that both of the materials are functioning from a moisture standpoint, although the Rockwool with vapor barrier provided better values than the polyurethane insulation. These conclusions applied to both roof and wall constructions. From a fire standpoint both of the materials worked in the wall construction. The roof should however retain the current construction design. The solution with polyurethane insulation does not meet the fire requirements.

  • 77.
    Hermansson, Emil
    et al.
    Uppsala universitet, Teknisk-naturvetenskapliga vetenskapsområdet, Tekniska sektionen, Institutionen för teknikvetenskaper, Tillämpad mekanik, Byggteknik.
    Hesselgren, Mattias
    Uppsala universitet, Teknisk-naturvetenskapliga vetenskapsområdet, Tekniska sektionen, Institutionen för teknikvetenskaper, Tillämpad mekanik, Byggteknik.
    Sambandet mellan produktionsplanering och arbetsmiljö: En studie hur produktionsplaneringen kan bli bättre med avseende på arbetsmiljö2019Självständigt arbete på grundnivå (yrkesexamen), 10 poäng / 15 hpStudentuppsats (Examensarbete)
    Abstract [en]

    The work aims to investigate how site managers are planning projects, and how this is experienced by the craftsmen regarding work environment with a psychosocial and physical aspect and construction management. Recommendations are made to improve construction management based on the results from the interviews. The work is being carried out as there is a greater focus on work environment in the workplaces today. A way to facilitate the additional administrative work that arises with this focus is to improve production planning. Placing a greater focus and more time before production has started can be beneficial to the construction project. In the report ten interviews are made from five different projects where we interview a site manager and a craftsman on each project. Among the site managers, many felt that there was a high workload due to lack of resources or additional work. All interviewees agree unanimously that one should have a craftsman or safety representative at an earlier stage during the production planning. Several site managers are requesting a clearer structure in the organization at an earlier stage in production planning. Craftsmen request official meetings with a clearer structure on the information provided.

  • 78.
    Hjälte, Johan
    et al.
    Uppsala universitet, Teknisk-naturvetenskapliga vetenskapsområdet, Tekniska sektionen, Institutionen för teknikvetenskaper, Tillämpad mekanik, Byggteknik.
    Fredin, Johan
    Uppsala universitet, Teknisk-naturvetenskapliga vetenskapsområdet, Tekniska sektionen, Institutionen för teknikvetenskaper, Tillämpad mekanik, Byggteknik.
    Minimiarmering enligt Eurokod: En jämförelse mellan EKS 9 och EKS 102016Självständigt arbete på grundnivå (yrkesexamen), 10 poäng / 15 hpStudentuppsats (Examensarbete)
    Abstract [sv]

    Detta examensarbete behandlar minimiarmering i betongkonstruktioner och deändringar som skett i regelverket kring detta i och med införandet av EKS 10.EKS 10 infördes första januari 2016 och är den svenska nationella bilagan tillden europagemensamma Eurokod. Införandet av EKS har betytt att fler kapitelfrån Eurokod nu är anpassade till svenska förhållanden och även att kraven påminimiarmering har mildrats.Syftet med detta examensarbetet är att underlätta beräkningar av minimiarmering för Byggnadstekniska Byrån i Stockholm. Som en del iexamensarbetet skapas en beräkningsmall i Microsoft Excel. Utöverberäkningsmallen analyseras vanligt förekommande betongtvärsnitt med avseende på armeringsmängder och ekonomi.Resultatet visar att det har skett en minskning av minimiarmeringen i alla detvärsnitt som undersökts i detta examensarbete. De ändrade bestämmelsernahar fått konsekvensen att minsta mängd sprickarmering i exempelvis balkaroch plattor minskat med mellan 10 och 32 procent. För slanka väggar harminsta mängd vertikalarmering minskat med 50 procent och 100 procent föricke slanka väggar, medan minsta horisontalarmering minskat med 75respektive 100 procent.Detta leder enligt de beräkningar som utförts för en antagen exempelvåning tillen potentiell minskad materialkostnad på upp till 65 eller 118 kronor perkvadratmeter, beroende på om väggarna betraktas som slanka eller inte.

  • 79.
    Holm, Mathias
    et al.
    Uppsala universitet, Teknisk-naturvetenskapliga vetenskapsområdet, Tekniska sektionen, Institutionen för teknikvetenskaper, Tillämpad mekanik, Byggteknik.
    Engström, Johan
    Uppsala universitet, Teknisk-naturvetenskapliga vetenskapsområdet, Tekniska sektionen, Institutionen för teknikvetenskaper, Tillämpad mekanik, Byggteknik.
    Logistik i byggbranschen: För förbättrad arbetsmiljö och effektivitet2013Självständigt arbete på grundnivå (yrkesexamen), 10 poäng / 15 hpStudentuppsats (Examensarbete)
    Abstract [sv]

    Logistik inom byggbranschen är ett område där det finns stora möjlig- heter för förbättringar och effektiviseringar. En stor andel av yrkesarbe- tarnas arbetstid går idag åt till icke värdeskapande aktiviteter. Under- sökningar har visat att endast 50 % av arbetstiden används till effektivt arbete. (Byggchefen, 2006) Det tillsammans med andra former av slöseri leder till stora kostnader. Slöseriet i byggprojekt uppskattas vara så stort som 30-35 % av projektetens produktionskostnad. (Josephson & Saukkoriipi, 2005)

    Syftet med examensarbetet är att genom intervjuer, enkäter och obser- vationer undersöka logistikproblem inom byggbranschen. Två av Skanskas byggprojekt i Uppsala undersöks i denna rapport för att iden- tifiera problem. Målet med examensarbetet är att ta fram lösningsför- slag som förbättrar arbetsmiljö och effektivitet genom förbättrade lös- ningar kring logistik.

    Rapporten visar att företag inom byggbranschen bör satsa på utomstå- ende tjänster med smarta logistiklösningar för att förbättra arbetsmiljö och effektivitet. Lösningar som kan användas är behovsstyrda leveran- ser och tredjepartslogistik med tjänster som sampackning, mellanlag- ring och inbärningstjänster. Tjänsterna kan vara bra att använda även då omständigheterna runt projektet ej kräver det eftersom det ger bättre arbetsmiljö och effektivitet.

    Rekommendationer ges till att ha tydliga rutiner och utse en ansvarig person för mottagning av material. Samarbete och kommunikation med övriga aktörer i försörjningskedjan är viktig. Även planering och upp- följning av denna är nödvändig för att logistiken ska kunna fungera på ett effektivt sätt. 

  • 80.
    Hovemyr, Edwin
    et al.
    Uppsala universitet, Teknisk-naturvetenskapliga vetenskapsområdet, Tekniska sektionen, Institutionen för teknikvetenskaper, Tillämpad mekanik, Byggteknik.
    Rostvik, Ludvig
    Uppsala universitet, Teknisk-naturvetenskapliga vetenskapsområdet, Tekniska sektionen, Institutionen för teknikvetenskaper, Tillämpad mekanik, Byggteknik.
    Prioriterade studentbostäder: Ett projekteringsunderlag för kostnadseffektivare utformning utifrån studenters egna prioriteringar2017Självständigt arbete på grundnivå (yrkesexamen), 10 poäng / 15 hpStudentuppsats (Examensarbete)
    Abstract [sv]

    Rapporten handlar om vilka funktioner studenter prioriterar och värdesätter i studentbostäder. Innehållet i rapporten kan användas som underlag vidprojektering av nya studentbostäder. Det för att studentbostäder ska stämma överens bättre med studenters önskemål samtidigt som produktionen av studentbostäder kan bli mer kostnadseffektiv. Rapporten undersöker vilka funktioner i en bostad som studenter prioriterar och värdesätter och under vilka förutsättningar studenter kan tänka sig att dela funktioner med andra. Dessutom undersöks om studentbostadsbyggandet behöver differentieras för att bättre passa olika grupper av studenter. Undersökningen har genomförts främst meden enkätstudie där 839 svenska studenter svarade på en internetbaserad enkät. Därefter genomfördes en intervjustudie med utvalda studenter som representerade olika grupper. Arbetet har genomförts i samarbete med fastighetsbolaget Rikshem AB. Vidare genomfördes en intervjustudie med andra aktörer som är med och påverkar utformningen av studentbostäder. Det gjordes för att förslagen som presenteras i rapporten ska gagna alla involverade parter, vara realistiska och genomförbara samt bidra till ett mer kostnadseffektivt byggande av studentbostäder. Som bakgrund till rapporten ligger den rådande bostadsbristen och svårigheten att få nybyggnadsprojekt med studentbostäder att gå ihop ekonomiskt. Samtidigt så finns det ett missnöje bland många studenter över de studentbostäder som finns, dels över bristande funktion och dels över höga hyror i nyproduktion. Resultatet av arbetet visar att den boendeform som studenter prioriterar högst är en så kallad kompislägenhet där två studenter delar gemensamma utrymmen, badrum och kök. I andra hand prioriterar studenterna en studentlägenhet där en student ensamt har alla funktion i bostaden. Resultatet av arbetet visar även att studenter främst prioriterar större sociala ytor, egen balkong och diskmaskin i bostaden. Dock är det förstnämnda inte ekonomisk realistiskt att införa i praktiken. Studenter prioriterar inte att ha tvättmaskin i lägenheten, större arbetsplats eller förvaring. Slutligen lämnas rekommendationer för utformningen av studentbostäder och det konstateras att de skillnader som finns mellan olika grupper av studenter inte kräver några nya boendetyper än de som i övrigt tas upp i rapporten.

  • 81.
    Hultgren, Olov
    Uppsala universitet, Teknisk-naturvetenskapliga vetenskapsområdet, Tekniska sektionen, Institutionen för teknikvetenskaper, Tillämpad mekanik, Byggteknik.
    Dammsäkerhetsanalys via stabilitetsberäkningar för Långströmmens kraftverk: En jämförelse mellan olika dimensioneringsmetoder2014Självständigt arbete på grundnivå (yrkesexamen), 10 poäng / 15 hpStudentuppsats (Examensarbete)
    Abstract [en]

    A detailed dam safety evaluation (in Sweden called FDU) was performed in 2009 by WSP where stability control was performed for Långströmmen power plant with associated spillways. This evaluation concluded that stability could not be ensured, and risk of sliding occurred. The evaluation is based entirely on the recommendations outlined in RIDAS, the power companies guidelines for dam safety, and it is clear that extensive renovations are necessary to stabilize the dam.

    In this work, the stability will also be checked with guidance through new proposals on guidelines for concrete dams sliding stability, ELFORSK’s report 08:59. This report considered the guidelines in RIDAS as oversimplified, both from an international perspective, but also with regard to the current state of knowledge regarding dam safety. They also believe that RIDAS gives inconclusive results, since for some dams provide conservative results and for other dams result in the unsafe side. This report should therefore check the effect of calculating stability with use of the two dimension methods to get results that can then be analyzed for discussion regarding the appropriateness of using the new proposals on guidelines provided in ELFORSK.

    Via the use of ELFORSK requires that most material parameters are decided through further examinations of the rock in situ. These material parameters are then used to determine the shear strength of the interface between concrete and rock in the foundation section of the dam. Where the sliding safety be determined with respect to the contact surface both with and without the influence of adhesion.

    The results of the calculations through both RIDAS and ELFORSK are presented in the following report. Results are based on the screening of Långströmmen spillways, and one of its monoliths. The results show that for cases where no adhesion counted obtained results that do not meet standards of sliding stability. This also applies to the calculation under RIDAS which also shows results that do not meet standards of sliding stability. In the comparison of methodologies related to the need for tensioning cables to achieve the necessary safety against sliding, thus given results that are directly comparable because methodologies relate to different safety factors. In the event that the adhesion counted achieved results well on the safe side.

    For use of ELFORSK’s proposed new guidelines, there are no objections to not be able to use these. Whether to include the adhesion of the contact area is seen as risky as this assumes that the adhesion is constant and thus is not lost along the dam’s life. Whereupon this method, including adhesion, is recommended to not be included in the calculation.

  • 82.
    Husain, Musleh
    Uppsala universitet, Teknisk-naturvetenskapliga vetenskapsområdet, Tekniska sektionen, Institutionen för teknikvetenskaper, Tillämpad mekanik, Byggteknik.
    KONTROLLBERÄKNING AV ETT TAKRAS PÅ EN TENNISHALL I NYKÖPING: En jämförelse mellan Eurokod och BKR2013Självständigt arbete på grundnivå (yrkesexamen), 10 poäng / 15 hpStudentuppsats (Examensarbete)
    Abstract [en]

    “Boverket” the Design Regulations in Sweden, also called BKR has for a long time

    been the mandatory standard that has guided and regulated construction design. But

    at the end of 2010 BKR was replaced with Eurocode. This report deals with the

    comparison of these two standards when it comes to wood construction. During

    winter 2009/2010 there were many roof collapses due to excessive loads on the

    roofs across Sweden. The majority of these roofs were made during 1980 when BKR

    was the existing norm, therefore, this report will investigate whether there is a big

    difference between designing of such roofs according to Eurocode instead of BKR.

    These two norms were compared by looking at the design of roof structures that

    consist of beams and columns. The roof beam was checked for buckling which is

    designed to support the tennis center in Nyköping, and also a centrally loaded pillar

    holding up the roof beam and superimposed loads.

    The result of this investigation showed that to design according to Eurocode would

    be more substantively economically because the design load bearing capacity becomes

    slightly larger.

    It was also observed that, there isn’t a big difference between designing according to

    BKR or Eurocode, therefore these roof collapses couldn’t occur due to designing

    according to BKR. Designing according to BKR is even safer, but not substantively

    economically as Eurocode. A comparison between the results indicate that the slight

    difference is mostly caused by the the differences between the parameters/coefficients

    used for design.

    The roof collapse in Nyköping was caused by carelessness or ignorance, this tennis

    center is undersized.

  • 83.
    Hähle, Philip
    et al.
    Uppsala universitet, Teknisk-naturvetenskapliga vetenskapsområdet, Tekniska sektionen, Institutionen för teknikvetenskaper, Tillämpad mekanik, Byggteknik.
    Bengs Davies, Sebastian
    Etappsamordning: En studie för att effektivisera kommunikationen och samordningen vid stadsutvecklingsprojekt2017Självständigt arbete på grundnivå (högskoleexamen), 10 poäng / 15 hpStudentuppsats (Examensarbete)
    Abstract [en]

    In Sweden, there are currently many ongoing city development projects that aim to improve the housing and work office situation. Due to the scope of these projects, they are generally divided into smaller stages. Within these stages there are many different entrepreneurs working on their own projects, but still share common ground for construction-related deliveries. However, there is currently a lack of incentive for the involved entrepreneurs to improve communication and coordination between themselves. The result of this leads to an increased difficulty to handle the logistics planning. As of late, some projects have an assigned work role, a stage coordinator, whose purpose is to communicate and coordinate with the involved entrepreneurs. However, the concept of this role hasn’t been sufficiently established within the construction sector yet. The concept is relatively new and because of this there hasn’t surfaced a proper working model yet.

    The purpose of this study is to examine and acquire knowledge about the underlying problems that reside between the entrepreneurs within the subject construction stage-coordination. The methodology of gathering information for the study was mainly carried out through interviews with professionals of the construction sector directly affiliated with the subject. Furthermore, the remaining information was gathered through literature about Lean, logistics and visual planning. Lastly, the remaining information were self-conducted study visits of affiliated stages.

    The results showed that there currently is very limited communication and coordination between the entrepreneurs. The respondents from the interviews claimed that there is a reluctance towards cooperating between the parties. The respondents explained that the reasoning behind this was that they wanted to conduct their own operations without having to involve other entrepreneurs. This usually leads to additional maintenance costs which they do not wish to be held accountable for, which they instead want the common client to be responsible over. However, they were positive towards utilisation of a visual planning software that could help them organize planning in-between themselves to help reduce unnecessary workload.

    When the conclusions for the above-mentioned information were made, the authors presented their own suggestions of how the visual planning software could be designed to alleviate communication and coordination in-between the entrepreneurs.

  • 84.
    Håkansson, Lisa
    et al.
    Uppsala universitet, Teknisk-naturvetenskapliga vetenskapsområdet, Tekniska sektionen, Institutionen för teknikvetenskaper, Tillämpad mekanik, Byggteknik.
    Dannfors, Julia
    Uppsala universitet, Teknisk-naturvetenskapliga vetenskapsområdet, Tekniska sektionen, Institutionen för teknikvetenskaper, Tillämpad mekanik, Byggteknik.
    BIM i produktion: En undersökning om hur BIM kan implementeras  i produktion2019Självständigt arbete på grundnivå (yrkesexamen), 10 poäng / 15 hpStudentuppsats (Examensarbete)
    Abstract [sv]

    Syftet med arbetet är att undersöka hur BIM kan implementeras i byggbranschen på ett bra och smidigt sätt ute i produktion. Detta ger NCC ett underlag för hur de ska gå tillväga för att denna process ska gå så lätt och smidigt som möjligt men också för att minska risken att fokus hamnar på fel ställe och att implementeringen utförs på ett sådant sätt att personalen blir mer negativa mot digitala hjälpmedel i produktionen.  Då yrkesarbetarna är de som hittills jobbat minst med digitala hjälpmedel har störst vikt lagts vid att undersöka hur implementeringen kommer att påverka dem och hur man ska göra för att få med dem i denna förändring.   BIM, Building Information Modeling, är egentligen byggbranschens digitalisering. Det bygger på att projekteringen utförs i 3D och sedan byggs modellen på med information som gör att arbetet kan effektiviseras och göras smidigare. Det går till exempel att rita upp hur väggarna är uppbyggda i skikt för att underlätta för kalkylatorn vid upphandlingar med underentreprenörer men också i produktion vid beställning av material. Detta minimerar dubbeljobb och effektiviserar produktionen. I projekteringen används det bland annat vid kollisionskontroller där olika discipliners modeller läggs ihop för att se om installationerna krockar någonstans. I förvaltning kan det användas genom att produkterna som använts läggs in i modellen, till exempel vilken armatur, för att sedan lätt kunna hitta den informationen när armaturen senare behöver bytas ut.   Det pratas ofta om att BIM är dyrt och det stämmer att det blir en högre kostnad i början av projekten. Däremot sparas tid och pengar i produktion och förvaltning. Fel som tidigare har upptäckts i produktion och har behövt lösas på plats så gott som försvinner.  Genom att intervjua personer som börjat använda sig av BIM i produktion har upptäckten gjorts att det finns bra och lätthanterliga program som underlättar och effektiviserar vissa delar av produktionen. Två av dessa program som används på NCC idag är Bluebeam och Dalux. Bluebeam används som dokumenthantering där länkar mellan olika ritningar gör att det går snabbt och enkelt att hoppa mellan ritningar. Dalux är ett lättanvändligt program där du kan se projektet i 2D och 3D samtidigt vilket ger en lättare förståelse för vad som ska byggas genom att du kan gå omkring i projektet i 3D. Dalux har även en gratis app som alla yrkesarbetare skulle kunna använda för att öka förståelsen av vad dom bygger vilket skulle kunna göra att frågorna till arbetsledningen skulle minska. Ett problem är då hur man ska lösa det med mobiler och surfplattor till alla, om man inte får använda sin egen eller äger någon privat. Ett annat problem med digitaliseringen är att hårdvarorna är väldigt ömtåliga och ska användas i en hård miljö samt så har internet en tendens att krascha med jämna mellanrum vilket gör att man alltid måste ha en backup av de aktuella ritningarna och modellerna.  En annan fråga är hur man ska få alla att använda sig av de digitala verktygen. Här är de som intervjuats överens om att det med största sannolikhet handlar om hur intresserad man är av teknik och att det är en generationsfråga. De menar att det med generationsskiftet kommer bli lättare att implementera BIM i yrkesarbetarnas arbete.   För att implementera BIM i produktion på ett så bra och smidigt sätt som möjligt bör ordentliga utbildningar av platsledning och yrkesarbetarna genomföras för att sprida kunskapen om vilka möjligheter som finns inom företaget men också för att ge personalen en bra grund så att de känner sig säkra i programmen när de ska börja användas. Det kan öka intresset även hos de som varit negativt inställda från början. Yrkesarbetarna bör använda programmen som visuell hjälp genom att gå omkring i 3D modellen och för att snabbare kunna navigera sig mellan olika ritningar genom länkar. Arbetsledarna kan ha en högre svårighetsgrad med fler funktioner, bland annat olika lager och möjligheten att uppdatera ritningar och modeller. 

  • 85.
    Håkansson, Maja
    et al.
    Uppsala universitet, Teknisk-naturvetenskapliga vetenskapsområdet, Tekniska sektionen, Institutionen för teknikvetenskaper, Tillämpad mekanik, Byggteknik.
    Andersson, Sebastian
    Uppsala universitet, Teknisk-naturvetenskapliga vetenskapsområdet, Tekniska sektionen, Institutionen för teknikvetenskaper, Tillämpad mekanik, Byggteknik.
    Modellering av mark i beräkningsmodeller: En jämförelsestudie mellan tre beräkningsmetoder2018Självständigt arbete på grundnivå (yrkesexamen), 10 poäng / 15 hpStudentuppsats (Examensarbete)
    Abstract [sv]

    Datoriserade program för att göra konstruktionsberäkningar har utvecklats snabbt under de senaste 30 åren. Programmen har gått från att vara enkla och endast kunna utföra specifika beräkningar till att bli mer avancerade vilket ger möjlighet till utförligare beräkningar. Trots tillgången till avancerade beräkningsprogram används idag i stor utsträckning fortfarande handberäkningar eller enkla beräkningsprogram för kontroll och dimensionering av grundkonstruktioner.

    Syftet med examensarbetet är att undersöka hur beräkningsresultaten av grundtryck och sättningar skiljer sig mellan två program. Programmen som används är WIN-Statik Foundation vilket är ett enklare program och FEM-Design vilket är ett mer avancerat program. I programmet FEM-Design genomförs beräkningarna med två olika metoder: den ena där jorden modelleras med en bestämd styvhet (bäddmodul) och den andra där jorden modelleras som en volym (3D-soil) där aktuell jordlagerföljd och egenskaper anges direkt i programmet. Användarvänligheten och resultattolkning av programmet utvärderas för att ta reda på varför många konstruktörer frångår FEM-Design vid beräkning av grundkonstruktioner. Målet är att genom framtagande av en användarguide öka användandet av FEM-Design genom hela dimensioneringsprocessen.

    Tre olika typkonstruktioner har använts för att utföra beräkningarna: ett enskilt pelarfundament, en grupp av 3 pelarfundament samt en platta på mark. Beräkningsresultaten jämfördes dels mellan programmen och dels mellan konstruktionerna. Jämförelserna har visat att FEM-Design med metoden 3D-soil är att föredra speciellt vid beräkningar av fundament som ligger nära varandra då fundamentens påverkan på varandra försummas i de andra beräkningsmetoderna. Den största sättningen som fundamenten i pelargruppen beräknades orsaka, mer än fördubblades jämfört med sättningen för det enskilda fundamentet när beräkningen gjordes med 3D-soil. De andra två metoderna gav precis samma sättning för både det enskilda pelarfundamentet och gruppen av pelarfundament. För plattan på mark gav beräkning med 3D-soil mer än det dubbla maximala grundtrycket än beräkning med bäddmodul. Fördelen med WIN-Statik är att det endast krävs ett fåtal ingångsvärden och att beräkningen går snabbt att genomföra. I de flesta fall leder dock programmets förenklingar till att fundamenten blir fel dimensionerade.

  • 86.
    Höjenfält, Emil
    et al.
    Uppsala universitet, Teknisk-naturvetenskapliga vetenskapsområdet, Tekniska sektionen, Institutionen för teknikvetenskaper, Tillämpad mekanik, Byggteknik.
    Larsson, Niklas
    Uppsala universitet, Teknisk-naturvetenskapliga vetenskapsområdet, Tekniska sektionen, Institutionen för teknikvetenskaper, Tillämpad mekanik, Byggteknik.
    Tidig dialog vid detaljplanering: Mindre kommuners möjligheter att föra en effektiv dialog med exploatörer2019Självständigt arbete på grundnivå (yrkesexamen), 10 poäng / 15 hpStudentuppsats (Examensarbete)
    Abstract [sv]

    I Sverige råder det krav på att en detaljplan skall vara upprättad innan någon bebyggelse av större betydelse får starta. Den process som leder fram till en detaljplan har kritiserats för att vara både tidskrävande och ofta skapa komplikationer mellan utvecklaren och kommunen. Det finns en handfull faktorer som spelar in och som måste tas i beaktning. Den mest framträdande är bristen på kommunikation mellan utvecklare och kommunen. Denna avhandling är inriktad på att försöka hitta den mest lämpliga metoden för att uppnå en framgångsrik tidig dialog mellan utvecklare och kommun innan det finns en detaljplan. Främst ligger fokus på att finna ett bra tillvägagångssätt som mindre kommuner kan använda när de kontaktar byggföretag. En undersökning av vilka faktorer som är av störst relevans för ett framgångsrikt och långsiktigt samarbete har även utförts. Från litteratur om ämnet och genom utförda intervjuer där både arbetare på kommun- och byggsidan fick komma till tal, kunde olika metoder för att genomföra en tidig dialog fastställas. Faktorer för ett framgångsrikt och långvarigt samarbete kunde även bestämmas. Förtroende, kompetens, ärlighet och en smartare användning av resurser lyfts fram som de viktigaste faktorerna enligt den intervjuade. Med de olika metoderna för att inleda en tidig dialog kan det konstateras att det inte finns något sätt att helt säkert kunna bestämma vilken metod som fungerar för en viss kommun. Olika kommuner är helt enkelt unika på sitt sätt med sina egna förutsättningar och begränsningar. Rätt metod för enskild kommun kan endast bestämmas genom att testa dem.

  • 87.
    Iveros, Madelene
    et al.
    Uppsala universitet, Teknisk-naturvetenskapliga vetenskapsområdet, Tekniska sektionen, Institutionen för teknikvetenskaper, Tillämpad mekanik, Byggteknik.
    Linde, Åsa
    Uppsala universitet, Teknisk-naturvetenskapliga vetenskapsområdet, Tekniska sektionen, Institutionen för teknikvetenskaper, Tillämpad mekanik, Byggteknik.
    Konsekvensen av sena ändringar i byggproduktionen: En utredning av ändrings-PM under produktionen2019Självständigt arbete på grundnivå (yrkesexamen), 10 poäng / 15 hpStudentuppsats (Examensarbete)
    Abstract [sv]

    Detta arbete undersöker ändringar av handlingar som sker vid produktframtagningen i byggprocessen, vilket benämns ändrings-PM i denna rapport. Syftet är att kartlägga problematiken kring ändrings- och tilläggsarbeten i ett sent skede och målet är att öka medvetenheten gällande ändrings-PM och dess konsekvenser.

    Arbetet genomförs under 10 veckor och begränsas därför till att undersöka projekt inom Serneke. Vidare kommer olika entreprenadformer och olika projekttyper att jämföras detta då de olika förutsättningarna i projekten förväntas generera olika mängder ändrings-PM.

    Metoden för detta arbete är dels en litteraturstudie, som förklarar olika begrepp och tillvägagångssätt, samt intervjuer och enkät som kompletteras med underlag från tre av Sernekes projekt.

    I resultatet framgår det att de undersökta projektens bedömda projekterings-kostnad överstigits på grund av ändringar som skett under produktionen. Sammanställningen av ändrings-PM från projekten samt enkätsvaren visar också att arkitekten och konstruktören har flest antal samt dyrast ändrings-PM. Vidare framgår det att övriga discipliners ändrings-PM varierar i antal mellan projekt. Vad gäller entreprenadform och projekttyp framgick det av enkäten och intervjuerna att utförandeentreprenader, kommersiella projekt och ROT-projekt rimligtvis genererar mer ändrings-PM dock kunde detta inte stärkas av något ytterligare material. Däremot kunde kommunikationsverktyget Byggnet undersökas med slutsatsen att det är ett väl fungerande informationssystem vid korrekt användning. Vidare anses projekteringen generera många fel som dyker upp i produktionen, vilket medför att en förbättrad projektering med erfarenhetsåterföring och kollisionskontroll borde upptäcka misstag i ett tidigare skede.

    För framtida projekt rekommenderas att nyttja entreprenörens erfarenhet av produktionen i projekteringen, att använda sig av erfarenhetsåterföring och kollisionskontroll, att införa ett datum för sista tillägg, att använda svensk standard vid upprättande av ändrings-PM samt att utföra ändringar efter ett publicerat ändrings-PM.

    Genom att vidare undersöka flera projekt med olika entreprenadformer och projekttyper skulle en kartläggning kunde göras för antalet ändrings-PM och hur de påverkar projektets kostnad och tidplan.

  • 88.
    Jansson, Ida
    et al.
    Uppsala universitet, Teknisk-naturvetenskapliga vetenskapsområdet, Tekniska sektionen, Institutionen för teknikvetenskaper, Tillämpad mekanik, Byggteknik.
    Widén, Matilda
    Uppsala universitet, Teknisk-naturvetenskapliga vetenskapsområdet, Tekniska sektionen, Institutionen för teknikvetenskaper, Tillämpad mekanik, Byggteknik.
    Erfarenhetsåterföring mellan organisationer i byggproduktion: Ett arbete utfört i samarbete med NCC Hus i Uppsala2019Självständigt arbete på grundnivå (yrkesexamen), 10 poäng / 15 hpStudentuppsats (Examensarbete)
    Abstract [en]

    The construction process includes many steps, phases and moments from the idea until the product is completed and handed over to the customer. Construction companies usually divide their work into several projects where the employees work in parallel project teams.

     

    In this report, a study together with NCC Hus in Uppsala has been performed in order to improve their return of experience. The main goal with the study is to identify the extent of the need in the process of returning experiences between the organizations in the production stage. The report is based on interviews and a case study, together with theoretical background to create an idea of the situation, the need and possible improvements that applies to return of experience.

     

    In the report we have come to the conclusion that the employees at NCC Hus in Uppsala are positive to spreading their knowledge and experience. The individuals in the organizations has a lot of knowledge and experiences, but there are no structured methods for when and how experiences should be collected and documented. The study shows that the extent of the need consists development of reference sheets that facilitate oral communication and documented experience regarding work preparation, work environment and choice of materials. The study suggests that the documentation should be kept simple and not superfluous, and that the information should be easily accessible and quality assured for the benefit to be valuable. In summary, through involvement and structured systems, the process has great development potential.

  • 89.
    Jansson, Johan
    et al.
    Uppsala universitet, Teknisk-naturvetenskapliga vetenskapsområdet, Tekniska sektionen, Institutionen för teknikvetenskaper, Tillämpad mekanik, Byggteknik.
    Jumlin, Kenny
    Uppsala universitet, Teknisk-naturvetenskapliga vetenskapsområdet, Tekniska sektionen, Institutionen för teknikvetenskaper, Tillämpad mekanik, Byggteknik.
    Nyckeltal inom projektering: En undersökning av uppdelade kostnader förprojektering av förskolor och skolor2019Självständigt arbete på grundnivå (yrkesexamen), 10 poäng / 15 hpStudentuppsats (Examensarbete)
    Abstract [en]

    The objective of this report is to examine the estimated cost in thedesign phase when building schools or preschools in Sweden. The contentcan be used in early stages of a project to get a better picture ofwhat the cost might be of each profession. Furthermore the reportexamines current key figures used in the industry as of today. The workhas been done in collaboration with ÅF-Pöyry AB. The backgroundgenerating this report is the uncertainty around the design phase costsand how it is divided between the professions.The key figures are presented as a percentage of the total productioncost and the result in design phase is 11,2 % for preschools and6,9 % for schools.Additionally the report present how the total production cost varieswith increasing amount of children or size (BTA). Finally the reportsuggest how the new key figures and results should be used.

  • 90.
    Johannesson, Simon
    Uppsala universitet, Teknisk-naturvetenskapliga vetenskapsområdet, Tekniska sektionen, Institutionen för teknikvetenskaper, Tillämpad mekanik, Byggteknik.
    Förskolor med passivhusteknik: En utredning av passiva förskolor2013Självständigt arbete på grundnivå (yrkesexamen), 10 poäng / 15 hpStudentuppsats (Examensarbete)
    Abstract [en]

    As a result of directives from EU, with the ambition to reach environmetal goals, The German organisation Passivhaus Institut has defined a passive house. A passive house is a building that is very energy efficient and makes a small impact on the environment. The energy from the inhabitants as well as the appliances & fixtures in the building should equal the energy that is required to heat the building. A Swedish version of the passive house definition has been defined, taking into account the climate conditions and the difference in building regulations.

    This thesis is a request from Skanska on how it can improve and develop an ongoing passive house project, involving an infant school. The intention of this thesis is to identify difficulties & display potential development areas for infant schools.

    The method of research conducted is as follows: interviews of clients, ventilation consultant, consultant for heating system and an energy calculation consultant, an inspection of the infant shcool in process, investigation of completed infant schools and a study of relevant literature.

    From this research it was found that it is difficult for infant schools to pass the criteria for passive houses. The conclusion of this thesis provide several guidelines on how to improve the outcome of existing projects & the steps needed to be taken for future development in this area.

  • 91.
    Johansson, Emil
    Uppsala universitet, Teknisk-naturvetenskapliga vetenskapsområdet, Tekniska sektionen, Institutionen för teknikvetenskaper, Tillämpad mekanik, Byggteknik.
    Granskning av Solibri Model Checker - En Svenskanpassning: Jämförelse av två egenkontrollsystem2013Självständigt arbete på grundnivå (yrkesexamen), 10 poäng / 15 hpStudentuppsats (Examensarbete)
    Abstract [en]

    The building industry are currently going through a huge alteration. The introduction of BIM (Building Information Modeling). Which also implements a lot of new ways of solving problems that building modeling can cause. This report is written for Uppsala University in cooperation with Temagruppen in Uppsala. However, it contains a comparison between two different systems that checks building models. Temagruppen invested in a new Swedish adaptation of a software called Solibri Model Checker. This Software controlling the availability in building models, it also introduces a new way of interaction between different instances during a building project. The definition of the report is availability in public buildings. A building model has been designed in Revit, then imported to Solibri Model Checker who controls the availability and creates a report of certain design fault. Interviews are given to get a look into how the work with availability controls currently works at Temagurppuen. This results in a discussion of benefits and disadvantages

    of the two different methods. The result finally shows that certain work can be more effectively done with Solibri Model Checker. But availability contains more than just disabled impairment. Visual- and cognitive impairment can’t still be controlled by just a computer software. 

  • 92.
    Johansson, Louise
    Uppsala universitet, Teknisk-naturvetenskapliga vetenskapsområdet, Tekniska sektionen, Institutionen för teknikvetenskaper, Tillämpad mekanik, Byggteknik.
    Att planera bort störningar: Verktyg för smartare tidplanering inom grundläggning2014Självständigt arbete på grundnivå (yrkesexamen), 10 poäng / 15 hpStudentuppsats (Examensarbete)
    Abstract [sv]

    Detta är ett examensarbete skrivet i samarbete med Skanska Grundläggning Syd med syftet att utreda hur deras planeringsarbete ser ut idag och vad som eventuellt kan göras bättre.

    Ett tidigare examensarbete har skrivits på avdelningen som undersökte produktiviteten ute på arbetsplatserna. I detta arbete var slutsatsen att produktionen stod still ca 40 % av arbetsdagen på grund av problem med maskiner eller leveranser, onödiga förflyttningar och att andra entreprenörer stod i vägen med mera. Målet med mitt arbete har varit att bygga vidare på detta och se om bättre planering kan bidra till att minska olika typer av produktionsstörningar.

    Underlaget till rapporten består av observationsstudier där arbetet på tre olika arbetsplatser följts samt av intervjuer med arbetsledare och andra personer som varit delaktiga i planeringsprocessen. Där noterades att en noggrann planering inte alltid görs, trots att det ofta finns krav på detta från beställaren. Tecken på detta syns bland annat på tidplanen och arbetsplatsdispositionsplanen som ofta är alltför odetaljerade. Resultatet blir att de kanske inte stämmer helt och är mycket svåra att följa upp. En effekt blir också att det är väldigt svårt att kommunicera hur stort utrymme entreprenören behöver och till när, vilket naturligtvis lätt leder till att de andra entreprenörerna på plats står i vägen eller inte har hunnit förbereda marken. Det uppstår också svårigheter hos leverantören av pålarna om inte projektet kan ge en tillräcklig framförhållning, vilket självklart ger problem med leveranser.

    De slutsatser som har dragits av undersökningarna är att arbetena behöver planeras mer noggrant och på ett sätt som går att kommunicera till andra. En rekommendation är att tidplanen görs visuellt genom markera etapper på en pålplan. En sådan visuell tidplan kan också användas som underlag för att diskutera dispositionen av arbetsytan och vilka ytor man behöver tillgång till. Utöver detta föreslås att en uppföljning görs av produktiviteten varje dag. En tredje rekommendation är att en checklista för planeringsstadiet tas fram, så att man inte behöver upprepa samma misstag som gjorts tidigare. När planeringen görs noggrant, erfarenheter sparas och kommunikationen på arbetsplatsen är öppen och tydlig så finns stora möjligheter till en trevligare arbetsmiljö och ett lönsamt projekt för alla inblandade.

  • 93.
    Johansson, Pontus
    Uppsala universitet, Teknisk-naturvetenskapliga vetenskapsområdet, Tekniska sektionen, Institutionen för teknikvetenskaper, Tillämpad mekanik, Byggteknik.
    Hisskärna av skalväggar i höga byggnader: Ett alternativ till den platsgjutna kärnan2013Självständigt arbete på grundnivå (yrkesexamen), 10 poäng / 15 hpStudentuppsats (Examensarbete)
    Abstract [en]

    A common way to stabilize high rise buildings is to use an elevator core built of concrete. Today, we use to build these elevator cores of in-situ concrete. Precast concrete twin wall (double wall) is a semi-finished product that has become more common in recent years. This diploma work studies how the twin wall works out as structural elements in an elevator core. The work also shows some possible ways of designing twin walls and highlights some important parts of the design that will be vital to the stability of the building.

        The result shows that it is important to think through where the element joints should be placed. The reason why this placement is important, is partly because of the stability of the structure and partly because the elements has to be mounted in a convenient way. The result also shows that it is more difficult to place the reinforcement in the twin walls than in an in-situ concrete wall. The consequence of this is that twin walls may need more space than an in-situ concrete wall to achieve the same load capacity.

  • 94.
    Joneby, Annika
    et al.
    Uppsala universitet, Teknisk-naturvetenskapliga vetenskapsområdet, Tekniska sektionen, Institutionen för teknikvetenskaper, Tillämpad mekanik, Byggteknik.
    Jonsson Norling, Sarah
    Uppsala universitet, Teknisk-naturvetenskapliga vetenskapsområdet, Tekniska sektionen, Institutionen för teknikvetenskaper, Tillämpad mekanik, Byggteknik.
    Infästning och montering av fasadskivor: En utvärdering av lämpliga metoder2014Självständigt arbete på grundnivå (yrkesexamen), 10 poäng / 15 hpStudentuppsats (Examensarbete)
    Abstract [sv]

    Enstegstätade putsade fasader har använts mycket vid byggproduktion av bostäder de senaste årtiondena. Efter att många av byggnaderna drabbats av fuktskador rekommenderas det istället att man bygger tvåstegstätade ventilerade fasader. Detta är enkelt att utföra med möjlighet till stor variation genom att använda fasadskivor.

    Tillsammans med Uppsala Universitet har uppdragsgivare till detta examensarbete varit NCC i Uppsala. Syftet med arbetet är att vara till framtida hjälp för projekteringsledare, inköpare och platschefer i valet av infästningssystem till projekt med fasadskivor. Projektet som studeras för att inhämta kunskap är Kvarntornen i Uppsala, en elvavåningsbyggnad med fasad av aluminiumskivor. I projektet används NCCs typyttervägg; en utfackningsvägg med träreglar.

    Examensarbetet har bestått av intervjuer med personer som arbetar/har arbetat med fasadskivor och dess infästning, till exempel leverantörer och personer från tidigare projekt på NCC. De faktorer som står i fokus för examensarbetet är materialåtgång, arbetsmiljö och kostnad för att undersöka vilka alternativ för infästningssystem och byggnadsställningar som är möjliga att använda vid projekt Kvarntornen.

    Resultatet visar att det är mest lönsamt att använda sig av ett system som består av horisontella profiler som fästs i utfackningsväggens reglar och sedan vertikal läkt som fästs i profilerna där infästning av fasadskivorna kan ske. Är det istället en yttervägg av betong finns fler alternativ för infästningsmetod. Som ställning rekommenderas att använda en arbetsplattform i form av klätterställning. Där det inte är möjligt att använda klätterställning på Kvarntornen är det enda rimliga alternativet att använda en hängställning.

    Slutsatsen av examensarbetet är en projekteringsanvisning för framtida projekt där man väljer att använda fasadskivor i kombination med utfackningsvägg.

  • 95.
    Jordebo, Robin
    Uppsala universitet, Teknisk-naturvetenskapliga vetenskapsområdet, Tekniska sektionen, Institutionen för teknikvetenskaper, Tillämpad mekanik, Byggteknik.
    Samverkan inom anläggningsbranschen: En studie om arbetsformens framgångsfaktorer2019Självständigt arbete på grundnivå (yrkesexamen), 10 poäng / 15 hpStudentuppsats (Examensarbete)
    Abstract [sv]

    Arbetsformen samverkan har funnits i över 20 år och har sedan dess använts flitigt inom större anläggningsprojekt. Tillsammans med Birka Markbyggnad AB är målet med denna studie att undersöka arbetsformens framgångsfaktorer, risker, för-och nackdelar inriktat mot entreprenadformer och ledarskap. Detta examensarbete ska sedan användas inom Birka för att öka vetskapen om arbetsformen men även ta del av den översiktliga kartläggningen om övriga medarbetares inställning till samverkan inom Skanska.

    Detta arbete har genomförts som en kvalitativ studie. Inledningsvis har information studerats genom en litteraturstudie som sedan följdes av en intervjustudie om fem personer, samt en kvantitativ enkätundersökning för yrkesarbetarnas erfarenheter i samverkansprojekt.

    Examensarbetets studier visar på att anläggningsbranschen innehåller många olika uppfattningar och modeller om vad samverkan egentligen innebär. Med den nya ISO 44001-standarden är branschens förhoppning att tydliggöra arbetsprocesserna i samverkan. Undersökningen visar vidare på att ledarskapet skiljer sig i ett samverkansprojekt i form av ett mjukare ledarskap. 

    Sammantaget visar teorin att de olika entreprenadformerna inte har några direkta för-och nackdelar i samverkan, medan intervjustudien förespråkare en totalentreprenad i samverkan. Slutsatsen är: en rätt kontraktsform och en tydlig samverkansplan är vägen till en långsiktigt hållbar lönsamhet i ett samverkansprojekt där bästa slutprodukt uppnås. 

  • 96.
    Jägeberg, Martin
    Uppsala universitet, Teknisk-naturvetenskapliga vetenskapsområdet, Tekniska sektionen, Institutionen för teknikvetenskaper, Tillämpad mekanik, Byggteknik.
    Utbredning av markvibrationer och stomljud från järnväg: Undersökning och anpassning av beräkningsmodell2013Självständigt arbete på grundnivå (yrkesexamen), 10 poäng / 15 hpStudentuppsats (Examensarbete)
    Abstract [sv]

    Med tåg som går i högre hastighet än förut och tåg som går tyngre lastade än förut upplever också omgivningen störningar från järnvägen i större utsträckning. För att få bukt med dessa problem jobbar man idag hårt för att försöka förutse utbredningen av vibrationer från järnväg. Med anledning av detta initierade Vectura idén till detta arbete. För att på bästa sätt kunna beräkna storleken på vibrationerna och oljudet från tågen behöver man hjälp av beräkningsmodeller. En beräkningsmodell kan ta hänsyn till faktorer som avstånd till järnvägen, vilket material som marken består av och förstås tågets hastighet och tyngd.

    Arbetet går ut på att hitta en lämplig beräkningsmodell som kan användas som hjälpmedel. Genom att undersöka vilka befintliga modeller det går att få tillgång till kan en modell väljas ut och vid behov anpassas för att fungera ännu bättre.

    Rapporten beskriver hur en äldre modell anpassas till modernare förutsättningar och, även om den här modellen blev användbar, hur mycket mer det går att göra inom ämnet med rätt kunskaper. Slutligen ges förslag till just hur det skulle gå att komma vidare inom ämnet och vilken riktning som är lämplig att gå.

  • 97.
    Karin, Rehn
    Uppsala universitet, Teknisk-naturvetenskapliga vetenskapsområdet, Tekniska sektionen, Institutionen för teknikvetenskaper, Tillämpad mekanik, Byggteknik.
    Upprustningsmetoder för en bankropp: En jämförelse ur ett LCC-perspektiv2014Självständigt arbete på grundnivå (yrkesexamen), 10 poäng / 15 hpStudentuppsats (Examensarbete)
    Abstract [en]

    In recent years, the Swedish railway track system has been neglected in terms of capacity and maintenance. To adapt the existing system to current traffic load there is a great need for extensive improvement and maintenance. Shortcomings are especially occurring on older embankments running over soft subgrades. To select the most suitable method for reinforcement of the embankment, it is important to evaluate different solutions from a life cycle cost perspective. In long-term perspective, it is often shown that a method with low investment cost causes a higher maintenance cost and a shorter technical lifetime. Today, most of the decisions regarding reinforcement and maintenance are based on existing experience and budgetary constraints. This can often limit the ability to think long term and make sustainable cost efficiencies. Currently the most common reinforcement method is ballast cleaning with frost insulation. A method that should be seen as relatively short-term and in most cases does not increase the capacity to a desired level. An alternative to this method is to reinforce the embankment with geogrid and shift the ballast in the top ballast layers. The method is practical more comprehensive but from a theoretical perspective it is more beneficial.

    The purpose of this study is therefore to investigate whether reinforcement of track bed using geogrids and shift ballast in the overlaying ballast layer is more beneficial from a life-cycle cost perspective, than ballast cleaning and new frost insulation.

    This study is based on a simplified life cycle cost analysis that includes investment costs, maintenance costs and energy costs. System boundaries and model specifications will be based on a literature review, reference projects and interviews with suppliers of used products and technical solutions. The established model should be seen as a simplification of reality but seeks to illustrate a realistic case where an older railway embankment over soft subgrade is in need of reinforcement.

    The life-cycle cost analysis showed that reinforce the track bed with geogrid and shifting ballast in the overlaying ballast layer was the most favorable option from both a cost and environmental standpoint. This is mainly due to the long lifetime and extended maintenance intervals. In the model, there is some uncertainty and it seems to be that an area that is in need of more research. If resources are spent on expanding the use of life-cycle cost analysis in the transport sector there can be economically, socially and ecologically sustainable development.

  • 98.
    Karppinen, Amanda
    et al.
    Uppsala universitet, Teknisk-naturvetenskapliga vetenskapsområdet, Tekniska sektionen, Institutionen för teknikvetenskaper, Tillämpad mekanik, Byggteknik.
    Linder, Fredrik
    Uppsala universitet, Teknisk-naturvetenskapliga vetenskapsområdet, Tekniska sektionen, Institutionen för teknikvetenskaper, Tillämpad mekanik, Byggteknik.
    Den temporära livsmedelsbutiken: En jämförande studie av platsbyggnation,modulbyggnation och tältbyggnation2017Självständigt arbete på grundnivå (yrkesexamen), 10 poäng / 15 hpStudentuppsats (Examensarbete)
    Abstract [en]

    When property owners are about to renovate and rebuild the tenants will need a

    temporary set-up. The purpose of this thesis is to investigate how a temporary

    solution for a grocery store may be designed. The thesis describes a comparison

    between three alternative solutions: modular building, tent building and a site-based construction. The study is limited to Swedish climate and four different

    subjects (viability, cost, sustainability and logistics). The results in this thesis are

    primarily based on interviews carried out with knowledgeable persons within the

    subject.

    The results show that to build a site-based construction is too expensive given the

    short time the building is to be used. The tent building is a new concept for this kind

    of business but it could be a good solution if more research is to be done on the

    subject. The modular construction is a relatively cheap, sustainable and safe choice

    of a temporary building and it’s recommended because of its simplicity.

  • 99.
    Khalaf, Bahuz
    Uppsala universitet, Teknisk-naturvetenskapliga vetenskapsområdet, Tekniska sektionen, Institutionen för teknikvetenskaper, Tillämpad mekanik, Byggteknik.
    Solcellsfasader - En jämförelse av celltyper och infästningssystem2019Självständigt arbete på grundnivå (yrkesexamen), 10 poäng / 15 hpStudentuppsats (Examensarbete)
    Abstract [en]

    In line with the expansion of the building industry, future projects like buildings and infrastructure require high demands on energy issues. EU directives and major global goals constantly set guidelines for what should be done and not.

    Construction and architecture companies in Sweden can influence what future cities will look like. This requires knowledge in these issues, not least about solar cell facades.

    Solar panels are mostly applied to roofs and big fields directed upwards towards the sun, but could one imagine solar cells integrated or applied to the facade of a building? This is what this thesis is about, and how the market looks today for these technologies in 2019. Therefore, the purpose is to compare solar cell technologies and attachment possibilities on facades of buildings. The goal is to give architects insight into how they are and can be used for future facade solutions.

    Most of the work has consisted of literature studies from books, reports research and the internet.

    The results turned out to be that the techniques are under a maturing phase after intensive research has been made in the field of solar cells, as well as increased use, lower prices and more efficient techniques. Today, it is possible to utilize solar cell facades in Sweden and other countries around the world. The sun is a renewable energy source that can cover the majority of the world's energy and electricity needs.

  • 100.
    Kihlström, Pontus
    Uppsala universitet, Teknisk-naturvetenskapliga vetenskapsområdet, Tekniska sektionen, Institutionen för teknikvetenskaper, Tillämpad mekanik, Byggteknik.
    Optimering av pumpdrift i Skanska Deep Green Cooling2016Självständigt arbete på grundnivå (yrkesexamen), 10 poäng / 15 hpStudentuppsats (Examensarbete)
    Abstract [sv]

    Skanska Deep Green Cooling är en energieffektiv metod för kontorskyla. Metoden bygger på att nyttja kylan som finns i marken för att kyla en byggnad. Under kalla delen av året så laddas berget åter med kyla samtidigt som värmen från berget förvärmer ventilationsluften.

    Deep Green Cooling bygger på principen att inte krångla till det i onödan, därmed har styrsystemet upprättats så enkelt som möjligt. Kylsystemet har i dag redan en mycket god verkningsgrad, men det finns möjlighet att höja den.

    Denna rapport tar upp två metoder för att effektivisera driften av Deep Green Cooling. Båda metoderna går ut på att minska onödiga förluster i systemet och därmed spara energi, teoretiska beräkningar visar på ungefär 7 procent i besparing. 

12345 51 - 100 av 211
RefereraExporteraLänk till träfflistan
Permanent länk
Referera
Referensformat
  • apa
  • ieee
  • modern-language-association
  • vancouver
  • Annat format
Fler format
Språk
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Annat språk
Fler språk
Utmatningsformat
  • html
  • text
  • asciidoc
  • rtf