In this work we present the economic performance of equilibrium cycles for a low power-density small modular reactor for long fuel residence time. The results of the selected pressurized light water reactor, suggesting no advances in long cycle operation, are presented. In addition, we present the strategy that will be adopted for the successive in-core fuel management optimization.